Residential construction wages: Howard, Hot Spring, Arkansas
Wage determination AR20260104 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AR20260104 on · latest revision 1 · verify at sam.gov/wage-determination/AR20260104/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $8.95 | $0.00 | $8.95 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $10.21 | $0.00 | $10.21 |
| ROOFER | $10.40 | $0.00 | $10.40 |
| PLUMBER | $13.98 | $0.00 | $13.98 |
| PAINTER: BRUSH AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.44 | $0.00 | $12.44 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $10.88 | $0.00 | $10.88 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $8.06 | $0.00 | $8.06 |
| LABORER: MASON TENDER - BRICK | $8.98 | $0.00 | $8.98 |
| LABORER: COMMON OR GENERAL | $8.35 | $0.00 | $8.35 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT AND UNIT) | $10.73 | $0.00 | $10.73 |
| ELECTRICIAN | $16.50 | $0.00 | $16.50 |
| CEMENT MASON/CONCRETE FINISHER | $12.20 | $0.00 | $12.20 |
| CARPENTER, INCLUDES CABINET INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND VINYL SIDING INSTALLATION | $14.07 | $0.00 | $14.07 |
| BRICKLAYER | $17.60 | $0.00 | $17.60 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.