Residential construction wages: Cleburne, Arkansas
Wage determination AR20260073 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AR20260073 on · latest revision 1 · verify at sam.gov/wage-determination/AR20260073/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| FENCE ERECTOR | $10.00 | $0.00 | $10.00 |
| ELECTRICIAN | $15.78 | $0.00 | $15.78 |
| DRYWALL HANGER | $12.00 | $0.00 | $12.00 |
| TRUCK DRIVER: DUMP TRUCK | $9.15 | $0.00 | $9.15 |
| TILE SETTER | $8.00 | $0.00 | $8.00 |
| SHEET METAL WORKER | $10.54 | $0.00 | $10.54 |
| ROOFER | $11.72 | $0.00 | $11.72 |
| PLUMBER | $13.71 | $0.00 | $13.71 |
| PAINTER: BRUSH AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $10.75 | $0.00 | $10.75 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $10.50 | $0.00 | $10.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $8.07 | $0.00 | $8.07 |
| LABORER: MASON TENDER - BRICK | $8.38 | $0.00 | $8.38 |
| LABORER: COMMON OR GENERAL | $7.87 | $0.00 | $7.87 |
| INSTALLER - SIDING | $10.75 | $0.00 | $10.75 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $10.00 | $0.00 | $10.00 |
| DRYWALL FINISHER/TAPER | $12.00 | $0.00 | $12.00 |
| CEMENT MASON/CONCRETE FINISHER | $13.00 | $0.00 | $13.00 |
| CARPENTER, INCLUDES CABINET INSTALLATION, AND FORM WORK (EXCLUDES DRYWALL HANGING) | $11.37 | $0.00 | $11.37 |
| BRICKLAYER | $13.41 | $0.00 | $13.41 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.