Heavy construction wages: Little River, Miller, Arkansas
Wage determination AR20260062 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AR20260062 on · latest revision 1 · verify at sam.gov/wage-determination/AR20260062/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $14.13 | $1.90 | $16.03 |
| PAINTER (BRUSH AND ROLLER) | $18.00 | $0.00 | $18.00 |
| OPERATOR: LOADER | $15.43 | $0.00 | $15.43 |
| OPERATOR: CRANE | $24.21 | $6.79 | $31.00 |
| OPERATOR: BULLDOZER | $16.32 | $1.65 | $17.97 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.09 | $0.00 | $17.09 |
| LABORER: PIPELAYER | $14.16 | $2.08 | $16.24 |
| LABORER: COMMON OR GENERAL | $11.00 | $0.00 | $11.00 |
| ELECTRICIAN | $22.88 | $7.19 | $30.07 |
| CEMENT MASON/CONCRETE FINISHER | $16.36 | $0.00 | $16.36 |
| CARPENTER, INCLUDES FORM WORK | $17.89 | $3.27 | $21.16 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.