Heavy construction wages: Sebastian, Arkansas
Wage determination AR20260057 · Active · Standard
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: BULLDOZER | $17.00 | $1.92 | $18.92 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.35 | $0.00 | $16.35 |
| LABORER: PIPELAYER | $14.54 | $1.82 | $16.36 |
| LABORER: COMMON OR GENERAL | $12.16 | $0.00 | $12.16 |
| ELECTRICIAN | $22.88 | $7.19 | $30.07 |
| CEMENT MASON/CONCRETE FINISHER | $15.23 | $0.00 | $15.23 |
| CARPENTER, INCLUDES FORM WORK | $16.47 | $1.93 | $18.40 |
| TRUCK DRIVER: DUMP TRUCK | $14.05 | $3.04 | $17.09 |
| PAINTER (BRUSH AND ROLLER) | $18.00 | $0.00 | $18.00 |
| OPERATOR: LOADER | $15.45 | $0.00 | $15.45 |
| OPERATOR: CRANE | $24.21 | $6.79 | $31.00 |