Heavy construction wages: Union, Arkansas
Wage determination AR20260043 · Active · Standard
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $13.12 | $0.00 | $13.12 |
| OPERATOR: BULLDOZER | $20.10 | $0.00 | $20.10 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.48 | $0.00 | $21.48 |
| LABORER: PIPELAYER | $12.25 | $0.00 | $12.25 |
| LABORER: COMMON OR GENERAL | $12.25 | $0.00 | $12.25 |
| CARPENTER, INCLUDES FORM WORK | $16.41 | $3.15 | $19.56 |