Heavy construction wages: Johnson, Arkansas
Wage determination AR20260040 · Active · Standard
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $14.66 | $0.00 | $14.66 |
| OPERATOR: BULLDOZER | $17.11 | $0.00 | $17.11 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.22 | $0.94 | $18.16 |
| LABORER: PIPELAYER | $12.56 | $1.19 | $13.75 |
| LABORER: COMMON OR GENERAL | $11.95 | $2.42 | $14.37 |
| CARPENTER, INCLUDES FORM WORK | $17.32 | $3.15 | $20.47 |