Building construction wages: Lonoke, Arkansas
Wage determination AR20260029 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AR20260029 on · latest revision 1 · verify at sam.gov/wage-determination/AR20260029/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| MILLWRIGHT | $34.02 | $11.88 | $45.90 |
| PAINTER (BRUSH, ROLLER, AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING) | $16.25 | $10.42 | $26.67 |
| PLUMBER (INCLUDES HVAC PIPE INSTALLATION) | $34.41 | $15.70 | $50.11 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $34.41 | $15.70 | $50.11 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $26.99 | $15.67 | $42.66 |
| TRUCK DRIVER: DUMP TRUCK | $13.80 | $0.71 | $14.51 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $23.56 | $2.77 | $26.33 |
| ROOFER | $15.39 | $0.00 | $15.39 |
| OPERATOR: ROLLER | $14.78 | $0.00 | $14.78 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.75 | $0.00 | $23.75 |
| OPERATOR: GRADER/BLADE | $14.66 | $0.00 | $14.66 |
| OPERATOR: CRANE | $17.52 | $0.00 | $17.52 |
| OPERATOR: BULLDOZER | $16.74 | $0.00 | $16.74 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.21 | $0.00 | $28.21 |
| LABORER: PIPELAYER | $14.00 | $0.00 | $14.00 |
| LABORER: MASON TENDER - BRICK | $12.37 | $0.00 | $12.37 |
| LABORER: COMMON OR GENERAL | $12.88 | $0.00 | $12.88 |
| IRONWORKER, STRUCTURAL | $19.61 | $0.00 | $19.61 |
| IRONWORKER, REINFORCING | $14.00 | $0.00 | $14.00 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $17.16 | $4.76 | $21.92 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $20.28 | $2.90 | $23.18 |
| DRYWALL FINISHER/TAPER | $15.38 | $0.00 | $15.38 |
| CEMENT MASON/CONCRETE FINISHER | $19.80 | $3.89 | $23.69 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING | $15.72 | $0.00 | $15.72 |
| BRICKLAYER | $20.33 | $3.77 | $24.10 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.