Building construction wages: Pope, Arkansas
Wage determination AR20260011 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AR20260011 on · latest revision 1 · verify at sam.gov/wage-determination/AR20260011/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $34.02 | $11.88 | $45.90 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $28.94 | $14.95 | $43.89 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $33.25 | $15.00 | $48.25 |
| POWER EQUIPMENT OPERATOR: CRANE | $34.25 | $15.00 | $49.25 |
| IRONWORKER, STRUCTURAL | $28.00 | $21.21 | $49.21 |
| PAINTER (SPRAY) | $16.25 | $10.42 | $26.67 |
| TRUCK DRIVER: DUMP TRUCK | $15.00 | $0.00 | $15.00 |
| PLUMBER | $14.54 | $1.08 | $15.62 |
| PAINTER (BRUSH AND ROLLER) | $17.78 | $0.00 | $17.78 |
| OPERATOR: BULLDOZER | $18.14 | $0.00 | $18.14 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.08 | $0.00 | $23.08 |
| LABORER: MASON TENDER - BRICK | $10.00 | $0.00 | $10.00 |
| LABORER: COMMON OR GENERAL | $12.28 | $2.26 | $14.54 |
| HVAC MECHANIC: HVAC DUCT INSTALLATION | $17.27 | $5.03 | $22.30 |
| CEMENT MASON/CONCRETE FINISHER | $15.62 | $0.00 | $15.62 |
| CARPENTER, INCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $15.21 | $0.00 | $15.21 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.