Highway construction wages: Dallas, Alabama
Wage determination AL20260130 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AL20260130 on · latest revision 1 · verify at sam.gov/wage-determination/AL20260130/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $12.95 | $0.00 | $12.95 |
| TRUCK DRIVER: LOWBOY TRUCK | $15.88 | $0.00 | $15.88 |
| TRUCK DRIVER: FLATBED TRUCK | $15.72 | $0.00 | $15.72 |
| TRUCK DRIVER: DUMP TRUCK | $13.29 | $0.00 | $13.29 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $12.61 | $0.00 | $12.61 |
| TRAFFIC CONTROL: FLAGGER | $13.40 | $2.90 | $16.30 |
| OPERATOR: TRACTOR | $15.24 | $0.00 | $15.24 |
| OPERATOR: ROLLER | $13.02 | $0.00 | $13.02 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.37 | $0.00 | $16.37 |
| OPERATOR: MILLING MACHINE | $12.72 | $0.00 | $12.72 |
| OPERATOR: MECHANIC | $17.97 | $0.00 | $17.97 |
| OPERATOR: LOADER | $13.96 | $0.00 | $13.96 |
| OPERATOR: GRADER/BLADE | $16.50 | $0.00 | $16.50 |
| OPERATOR: DISTRIBUTOR | $16.05 | $0.00 | $16.05 |
| OPERATOR: CRANE | $22.36 | $0.00 | $22.36 |
| OPERATOR: BULLDOZER | $16.59 | $0.00 | $16.59 |
| OPERATOR: BROOM/SWEEPER | $12.27 | $0.00 | $12.27 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $13.24 | $0.00 | $13.24 |
| OPERATOR: ASPHALT SPREADER | $13.96 | $0.00 | $13.96 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.15 | $0.00 | $17.15 |
| LABORER: COMMON OR GENERAL | $11.92 | $0.00 | $11.92 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $12.22 | $0.00 | $12.22 |
| LABORER GRADE CHECKER | $15.89 | $0.00 | $15.89 |
| IRONWORKER, REINFORCING | $16.28 | $0.00 | $16.28 |
| INSTALLER - GUARDRAIL | $14.16 | $2.94 | $17.10 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | $19.25 | $0.00 | $19.25 |
| ELECTRICIAN | $20.41 | $7.49 | $27.90 |
| CEMENT MASON/CONCRETE FINISHER | $14.46 | $0.00 | $14.46 |
| CARPENTER (FORM WORK ONLY) | $15.64 | $0.00 | $15.64 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.