Heavy construction wages: St Clair, Alabama
Wage determination AL20260113 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AL20260113 on · latest revision 1 · verify at sam.gov/wage-determination/AL20260113/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $12.25 | $2.58 | $14.83 |
| OPERATOR: LOADER, INCLUDES WATER SEWER LINES | $17.64 | $2.14 | $19.78 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES | $18.13 | $3.66 | $21.79 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $13.91 | $2.04 | $15.95 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $13.04 | $1.41 | $14.45 |
| ELECTRICIAN | $20.86 | $4.04 | $24.90 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | $12.00 | $0.00 | $12.00 |
| CARPENTER, INCLUDES FORM WORK | $20.26 | $8.59 | $28.85 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.