Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.10 | $16.40 | $47.50 |
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $32.57 | $14.05 | $46.62 |
| POWER EQUIPMENT OPERATOR: CRANE | $32.57 | $14.05 | $46.62 |
| POWER EQUIPMENT OPERATOR: (BACKHOE, EXCAVATOR, TRACKHOE) | $32.57 | $14.05 | $46.62 |
| IRONWORKER, STRUCTURAL | $33.75 | $14.03 | $47.78 |
| IRONWORKER, REINFORCING | $33.75 | $14.03 | $47.78 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $35.25 | $15.76 | $51.01 |
| TRUCK DRIVER: DUMP TRUCK | $13.60 | $0.00 | $13.60 |
| TILE SETTER | $20.00 | $0.00 | $20.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $20.00 | $3.77 | $23.77 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $28.00 | $4.17 | $32.17 |
| ROOFER | $13.66 | $0.00 | $13.66 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $18.97 | $0.36 | $19.33 |
| PAINTER: SPRAY | $14.31 | $0.00 | $14.31 |
| PAINTER (BRUSH AND ROLLER) | $15.31 | $1.41 | $16.72 |
| OPERATOR: ROLLER | $14.00 | $1.78 | $15.78 |
| OPERATOR: LOADER | $14.69 | $0.00 | $14.69 |
| OPERATOR: GRADER/BLADE | $17.52 | $0.89 | $18.41 |
| OPERATOR: BULLDOZER | $19.96 | $0.40 | $20.36 |
| LABORER: PIPELAYER | $15.59 | $0.00 | $15.59 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.23 | $0.00 | $14.23 |
| LABORER: MASON TENDER - BRICK | $12.22 | $0.00 | $12.22 |
| LABORER: COMMON OR GENERAL | $14.74 | $3.25 | $17.99 |
| GLAZIER | $23.00 | $5.64 | $28.64 |
| ELECTRICIAN | $17.57 | $2.41 | $19.98 |
| CEMENT MASON/CONCRETE FINISHER | $19.19 | $0.00 | $19.19 |
| CARPENTER, INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND SCAFFOLD BUILDER | $16.06 | $0.00 | $16.06 |
| BRICKLAYER | $22.00 | $0.00 | $22.00 |