Building construction wages: Madison, Alabama
Wage determination AL20260091 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AL20260091 on · latest revision 1 · verify at sam.gov/wage-determination/AL20260091/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.10 | $16.40 | $47.50 |
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| ELECTRICIAN | $32.96 | $15.67 | $48.63 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $32.57 | $14.05 | $46.62 |
| POWER EQUIPMENT OPERATOR: CRANE | $32.57 | $14.05 | $46.62 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $33.78 | $22.03 | $55.81 |
| TRUCK DRIVER: DUMP TRUCK | $13.60 | $0.00 | $13.60 |
| TILE SETTER | $20.00 | $0.00 | $20.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $19.15 | $3.97 | $23.12 |
| ROOFER | $13.66 | $0.00 | $13.66 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $20.00 | $4.82 | $24.82 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $20.48 | $5.50 | $25.98 |
| PAINTER: SPRAY | $14.31 | $0.00 | $14.31 |
| PAINTER (BRUSH AND ROLLER) | $15.29 | $5.68 | $20.97 |
| OPERATOR: ROLLER | $14.00 | $1.78 | $15.78 |
| OPERATOR: LOADER | $14.69 | $0.00 | $14.69 |
| OPERATOR: GRADER/BLADE | $17.52 | $0.89 | $18.41 |
| OPERATOR: BULLDOZER | $18.59 | $0.00 | $18.59 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.00 | $0.00 | $16.00 |
| LABORER: PIPELAYER | $13.88 | $0.00 | $13.88 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.24 | $0.00 | $13.24 |
| LABORER: MASON TENDER - BRICK | $11.00 | $0.00 | $11.00 |
| LABORER: COMMON OR GENERAL | $11.47 | $1.45 | $12.92 |
| IRONWORKER, STRUCTURAL | $21.77 | $6.77 | $28.54 |
| IRONWORKER, REINFORCING | $22.86 | $7.94 | $30.80 |
| GLAZIER | $19.14 | $2.30 | $21.44 |
| CEMENT MASON/CONCRETE FINISHER | $17.15 | $0.00 | $17.15 |
| CARPENTER, INCLUDES FORM WORK | $15.68 | $2.85 | $18.53 |
| BRICKLAYER | $19.81 | $0.00 | $19.81 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.