Residential construction wages: Greene, Hale, Alabama
Wage determination AL20260062 · Active · Standard
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $9.00 | $0.00 | $9.00 |
| SHEET METAL WORKER | $11.86 | $0.00 | $11.86 |
| ROOFER, INCLUDES BUILT UP, METAL, SHAKE & SHINGLE, AND SINGLE PLY ROOFS | $10.00 | $0.00 | $10.00 |
| PLUMBER | $12.27 | $0.00 | $12.27 |
| PAINTER | $9.38 | $0.00 | $9.38 |
| OPERATOR: LOADER (FRONT END) | $12.52 | $0.00 | $12.52 |
| OPERATOR: BULLDOZER | $12.60 | $0.00 | $12.60 |
| OPERATOR: BACKHOE | $11.20 | $0.00 | $11.20 |
| LABORER: PIPELAYER | $9.00 | $0.00 | $9.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $7.88 | $0.00 | $7.88 |
| LABORER: LANDSCAPE | $7.66 | $0.00 | $7.66 |
| LABORER: COMMON OR GENERAL | $8.53 | $0.00 | $8.53 |
| IRONWORKER, STRUCTURAL | $11.91 | $3.40 | $15.31 |
| IRONWORKER, ORNAMENTAL | $10.46 | $0.00 | $10.46 |
| ELECTRICIAN | $11.91 | $0.00 | $11.91 |
| DRYWALL HANGER | $15.00 | $0.00 | $15.00 |
| CEMENT MASON/CONCRETE FINISHER | $11.75 | $0.00 | $11.75 |
| CARPENTER, INCLUDES FORM WORK | $14.00 | $0.00 | $14.00 |
| BRICKLAYER | $13.29 | $0.00 | $13.29 |