| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $12.82 | $0.00 | $12.82 |
| ROOFER, INCLUDES BUILT UP, METAL, SHAKE & SHINGLE, AND SINGLE PLY ROOFS | $10.65 | $0.00 | $10.65 |
| PLUMBER | $10.83 | $0.00 | $10.83 |
| PAINTER, EXCLUDES DRYWALL FINISHING/TAPING | $9.33 | $0.00 | $9.33 |
| OPERATOR: LOADER (FRONT END) | $10.45 | $0.00 | $10.45 |
| OPERATOR: BULLDOZER | $12.60 | $0.00 | $12.60 |
| OPERATOR: BACKHOE | $11.45 | $0.00 | $11.45 |
| LABORER: PIPELAYER | $9.50 | $0.00 | $9.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $7.88 | $0.00 | $7.88 |
| LABORER: LANDSCAPE | $7.25 | $0.00 | $7.25 |
| LABORER: COMMON OR GENERAL | $7.36 | $0.00 | $7.36 |
| IRONWORKER, STRUCTURAL | $8.00 | $0.00 | $8.00 |
| IRONWORKER, ORNAMENTAL | $10.75 | $0.00 | $10.75 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | $10.40 | $0.00 | $10.40 |
| FLOOR LAYER: CARPET | $8.01 | $0.00 | $8.01 |
| ELECTRICIAN | $9.94 | $0.00 | $9.94 |
| DRYWALL HANGER | $8.13 | $0.00 | $8.13 |
| DRYWALL FINISHER/TAPER | $9.00 | $0.00 | $9.00 |
| CEMENT MASON/CONCRETE FINISHER | $8.00 | $0.00 | $8.00 |
| CARPENTER, INCLUDES FORM WORK, AND BLOWN INSULATION, (EXCLUDES DRYWALL HANGING) | $9.29 | $0.00 | $9.29 |
| BRICKLAYER | $11.75 | $0.00 | $11.75 |