Residential construction wages: De Kalb, Alabama
Wage determination AL20260018 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AL20260018 on · latest revision 1 · verify at sam.gov/wage-determination/AL20260018/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $10.08 | $0.00 | $10.08 |
| SHEETMETAL WORKER (HVAC DUCT INSTALLATION) | $12.80 | $0.00 | $12.80 |
| SHEET METAL WORKER | $10.47 | $0.00 | $10.47 |
| ROOFER, INCLUDES SHAKE & SHINGLE, AND SINGLE PLY ROOFS | $7.25 | $0.00 | $7.25 |
| PLUMBER | $11.18 | $0.00 | $11.18 |
| PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING | $10.06 | $0.00 | $10.06 |
| OPERATOR: BULLDOZER | $11.71 | $0.00 | $11.71 |
| OPERATOR: BACKHOE | $9.80 | $0.00 | $9.80 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $8.00 | $0.00 | $8.00 |
| LABORER: LANDSCAPE | $7.27 | $0.00 | $7.27 |
| LABORER: COMMON OR GENERAL | $7.60 | $0.00 | $7.60 |
| ELECTRICIAN, INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $11.15 | $0.00 | $11.15 |
| DRYWALL FINISHER/TAPER | $9.13 | $0.00 | $9.13 |
| CEMENT MASON/CONCRETE FINISHER | $12.59 | $0.00 | $12.59 |
| CARPENTER, INCLUDES FORM WORK, AND BLOWN INSULATION | $10.88 | $0.00 | $10.88 |
| BRICKLAYER | $12.25 | $0.00 | $12.25 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.