Residential construction wages: Cullman, Alabama
Wage determination AL20260016 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AL20260016 on · latest revision 1 · verify at sam.gov/wage-determination/AL20260016/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $10.08 | $0.00 | $10.08 |
| OPERATING ENGINEERS: OILER | $22.83 | $10.65 | $33.48 |
| IRONWORKER, STRUCTURAL | $33.75 | $14.03 | $47.78 |
| PIPEFITTER (SIX (6) MILES SOUTH OF CITY LIMITS OF THE CITY OF CULLMAN) | $35.25 | $15.76 | $51.01 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $10.47 | $0.00 | $10.47 |
| ROOFER, INCLUDES SHAKE & SHINGLE, AND SINGLE PLY ROOFS | $7.50 | $0.00 | $7.50 |
| PLUMBER | $10.21 | $0.00 | $10.21 |
| PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING | $9.79 | $0.00 | $9.79 |
| OPERATOR: BULLDOZER | $11.71 | $0.00 | $11.71 |
| OPERATOR: BACKHOE | $9.80 | $0.00 | $9.80 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $8.00 | $0.00 | $8.00 |
| LABORER: LANDSCAPE | $7.27 | $0.00 | $7.27 |
| LABORER: COMMON OR GENERAL | $7.25 | $0.00 | $7.25 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | $10.83 | $0.00 | $10.83 |
| ELECTRICIAN | $10.73 | $0.00 | $10.73 |
| DRYWALL FINISHER/TAPER | $12.00 | $0.00 | $12.00 |
| CEMENT MASON/CONCRETE FINISHER | $8.46 | $0.00 | $8.46 |
| CARPENTER, INCLUDES DRYWALL HANGING | $10.00 | $0.00 | $10.00 |
| BRICKLAYER | $12.20 | $0.00 | $12.20 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.