Residential construction wages: Anchorage, Alaska
Wage determination AK20260004 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AK20260004 on · latest revision 1 · verify at sam.gov/wage-determination/AK20260004/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDING HVAC DUCT) | $23.21 | $0.00 | $23.21 |
| ROOFER (EXCLUDING SHAKES/SHINGLES) | $13.13 | $0.00 | $13.13 |
| POWER EQUIPMENT OPERATORS: (EXCAVATOR) | $20.50 | $0.00 | $20.50 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $19.05 | $0.00 | $19.05 |
| PLUMBER/PIPEFITTER | $20.40 | $0.87 | $21.27 |
| PIPEFITTER (HVAC PIPING ONLY) | $18.50 | $0.00 | $18.50 |
| PAINTER | $12.29 | $0.00 | $12.29 |
| LABORER GENERAL (EXCLUDING FENCE ERECTING AND BATT AND BLOWN INSULATION) | $10.84 | $0.00 | $10.84 |
| LABORER (URETHAINE SPRAYER) | $19.00 | $0.00 | $19.00 |
| LABORER (HOD CARRIER/MASON TENDERS) | $14.24 | $0.00 | $14.24 |
| LABORER (EXCAVATION) | $9.00 | $0.00 | $9.00 |
| INSTALLER (BATT & BLOWN INSULATION) | $16.00 | $0.00 | $16.00 |
| GLAZIER | $17.50 | $0.00 | $17.50 |
| FENCE ERECTOR (INCLUDING WOOD AND CHAIN LINK) | $15.70 | $0.00 | $15.70 |
| ELECTRICIAN | $22.99 | $0.00 | $22.99 |
| DRYWALL HANGER | $10.00 | $0.00 | $10.00 |
| CEMENT MASON/CONCRETE FINISHER (INCLUDING CEMENT FINISHING) | $21.30 | $0.00 | $21.30 |
| CARPENTER (EXCLUDING DRYWALL HANGING AND BATT AND BLOWN INSULATION) | $15.85 | $0.00 | $15.85 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.