Carpenter prevailing wages: Rhode Island, county by county
5 current carpenter rates across 3 active Rhode Island wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Newport | CARPENTER (INCLUDING DRYWALL HANGING METAL STUD FRAMING, FORM SETTING, BATT INSULATION, DOWNSPOUTS & GUTTER INSTALLATION) | $12.95 | $5.51 | $18.46 | RI20260003 Residential |
| Providence + 3 more | CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, & METAL STUD FRAMING) | $15.32 | $9.65 | $24.97 | RI20260002 Residential |
| Providence + 4 more | CARPENTER: INCLUDES SOFT FLOOR LAYER (WORK ON FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER HOUR ADDITIONAL.) | $47.88 | $30.50 | $78.38 | RI20260001 Building, Heavy, Highway |
| Providence + 4 more | LABORER (BUILDING CONSTRUCTION): GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems | $37.00 | $26.90 | $63.90 | RI20260001 Building, Heavy, Highway |
| Providence + 4 more | LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 1: Laborer; Carpenter tender; Cement finisher tender; Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries | $33.05 | $24.05 | $57.10 | RI20260001 Building, Heavy, Highway |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Rhode Island trades.