Douglas County, Oregon: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building OR20260085 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT & FROST INSULATOR | $62.02 | $22.36 | $84.38 |
| BRICKLAYER | $49.60 | $25.15 | $74.75 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $54.75 | $16.90 | $71.65 |
| OPERATOR: CRANE (50-89 TON) | $53.60 | $16.90 | $70.50 |
| IRONWORKER | $48.31 | $34.52 | $82.83 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $43.79 | $17.05 | $60.84 |
| LABORER: HOD CARRIER | $43.79 | $17.05 | $60.84 |
| LABORER: PIPELAYER | $40.41 | $17.30 | $57.71 |
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 |
| PLUMBER | $60.77 | $34.72 | $95.49 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $54.99 | $33.92 | $88.91 |
| SHEET METAL WORKER: HVAC DUCT AND UNIT INSTALLATION ONLY | $45.09 | $30.40 | $75.49 |
| LABORER: COMMON OR GENERAL | $25.48 | $12.09 | $37.57 |
| CARPENTER | $32.68 | $13.09 | $45.77 |
| ELECTRICIAN | $50.97 | $23.90 | $74.87 |
Heavy OR20260066 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (DOUGLAS (THAT PORTION EAST OF THE COASTAL WATERSHED DIVIDE) COUNTY) | $47.04 | $21.84 | $68.88 |
| ELECTRICIAN (DOUGLAS REMAINDER OF COUNTY) | $50.03 | $24.00 | $74.03 |
| POWER EQUIPMENT OPERATOR GROUP 6 LOADERS: (LESS THAN 1 CU YD.); OILER; GRADE CHECKER; CRANE OILER;FORKLIFT; ROLLER (NON-ASPHALT) | $45.81 | $16.90 | $62.71 |
| POWER EQUIPMENT OPERATOR GROUP 5 TRACKHOE/BACKHOE HYDRAULIC: TRACK TYPE UP TO AND INCLUDING 20,000 LBS, WHEEL TYPE (FORD, JOHN DEER, CASE TYPE); BOOM TRUCK OPERATOR; DRILLING: CHURM DRILL AND EARTH BORING MACHINE OPERATOR; DIRECTIONAL DRILL OPERATOR LESS THAN 20,000 LBS PULLBACK; LOADERS, RUBBER TIRED TYPE , LESS THAN 25,00 LBS; FORKLIFT OVER 5 TON, BULLDOZER 20,000 LBS OR 100 HORSES OR LESS; ROLLER; COMPACTOR WITHOUT BLADE | $49.03 | $16.90 | $65.93 |
| POWER EQUIPMENT OPERATOR GROUP 4 CRANE: HYDRAULIC CRANE OPERATOR, UNDER 50 TONS; LATTICE BOOM CRANE OPERATOR: LATTICE BOOM CRANE OPERATOR, UNDER 50 TONS; TRACKHOE/BACKHOE-ROBOTIC: TRACK AND WHEEL TYPE, UP TO AND INCLUDING 20,0000 LBS. WITH ANY OR ALL ATTACHMENTS; BLADE: BLADE OPERATOR; TRACTOR OPERATOR WITH BOOM ATTACHMENT; DRILLING: CHURM DRILL AND EARTH BORING MACHINE OPERATOR; DIRECTIONAL DRILL OPERATOR OVER 20,000 LBS PULLBACK; CRANE: CHICAGO BOOM AND SIMILAR TYPES; BOOM TYPE LIFTING DEVICE, 5 TON CAPACITY OR LESS; RUBBER-TIRED SCRAPER, SINGLE ENGINE, SINGLE SCRAPER; COMPACTOR-SELF PROPELLED; LOADERS 25,000 LBS AND LESS THAN 60,000 LBS; BULLDOZER OVER 20,000 LBS AND MORE THAN 100 HORSE UP TO 70,000 LBS; SCREED; COMPACTOR WITH BLADE | $50.27 | $16.90 | $67.17 |
| POWER EQUIPMENT OPERATOR GROUP 3 HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITHOUT LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANES: LATTICE BOOM CRANE-50 THROUGH 89 TONS (AND LESS THAN 150 FEET BOOM); RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS; LOADER 60,000 LBS AND LESS THAN 120,000 LBS; BULLDOZER OVER 70,000 LBS UP TO AND INCLUDING 120,000 LBS; | $53.60 | $16.90 | $70.50 |
| POWER EQUIPMENT OPERATOR GROUP 2 CRANE: CABLEWAY OPERATOR, 25 TONS AND OVER; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS (WITHOUT LUFFING OR TOWER ATTACHMENT); TOWER/WHIRLEY OPERATOR: TOWER CRANE OPERATOR; WHIRLEY OPERATOR, UNDER 90 TONS; LATTICE BOOM CRANE: 90 THROUGH 199 TONS AND/OR 150 TO 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITH LUFFING OR TOWER ATTACHMENT); RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS; LOADER 120,000 LBS AND ABOVE; BLADE: AUTO GRADER; BLADE OPERATOR-ROBOTIC; BULLDOZER OVER 120,000 LBS AND ABOVE; | $54.75 | $16.90 | $71.65 |
| POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANE: OPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER | $60.98 | $16.90 | $77.88 |
| POWER EQUIPMENT OPERATOR GROUP 1A HYDRAULIC CRANE: HYDRAULIC OPERATOR, 200 TONS AND OVER (WITH LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANE: OPERATOR, 200 TONS THROUGH 299 TONS, WITH OVER 200 FEET BOOM; | $58.82 | $16.90 | $75.72 |
| POWER EQUIPMENT OPERATOR GROUP 1 CRANE: HELICOPTER OPERATOR, WHEN USED IN ERECTING WORK; WHIRLEY OPERATOR, 90 TON AND OVER; LATTICE BOOM CRANE: OPERATOR 200 TONS THROUGH 299 TONS, AND/OR OVER 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS WITH LUFFING OR TOWER ATTACHMENTS; | $56.66 | $16.90 | $73.56 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $48.31 | $34.52 | $82.83 |
| LABORERS: (MASON TENDER-CEMENT/CONCRETE) | $43.79 | $17.05 | $60.84 |
| LABORERS: GROUP 2 GRADE CHECKER; PIPELAYER; ASPHALT RAKER | $40.41 | $17.30 | $57.71 |
| LABORERS: GROUP 1 ASPHALT SPREADER | $39.11 | $17.30 | $56.41 |
| PAINTERS: (BRUSH, ROLLER AND SPRAY) | $39.94 | $16.68 | $56.62 |
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $31.81 | $6.33 | $38.14 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.59 | $2.96 | $30.55 |
| OPERATOR: MECHANIC | $19.84 | $6.14 | $25.98 |
| OPERATOR: EXCAVATOR | $21.68 | $5.88 | $27.56 |
| OPERATOR: BROOM/SWEEPER | $32.31 | $6.43 | $38.74 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $22.77 | $7.90 | $30.67 |
| LABORER: FLAGGER | $17.61 | $5.96 | $23.57 |
| LABORER: COMMON OR GENERAL | $18.72 | $5.99 | $24.71 |
| CARPENTER, INCLUDES FORM WORK | $23.20 | $9.47 | $32.67 |
| TRUCK DRIVER GROUP 7 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 80 CU. YDS. AND INCLUDING 100 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS WATER TRUCK UP TO 3,000 GALLONS | $36.82 | $18.30 | $55.12 |
| TRUCK DRIVER GROUP 6 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 60 CU. YDS. AND INCLUDING 80 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.57 | $18.30 | $54.87 |
| TRUCK DRIVER GROUP 5 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 50 CU. YDS. AND INCLUDING 60 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.35 | $18.30 | $54.65 |
| TRUCK DRIVER GROUP 4 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 30 CU. YDS. AND INCLUDING 50 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS; WATER TRUCK OVER 10,000 TO 15,000 GALLONS | $36.08 | $18.30 | $54.38 |
| TRUCK DRIVER GROUP 3 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 10 CU. YDS. AND INCLUDING 30 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS; WATER TRUCK OVER 5,000 TO 10,000 GALLONS | $35.74 | $18.30 | $54.04 |
| TRUCK DRIVER GROUP 2 DUMP TRCUKS/ARTICULATED DUMPS 6 CU TO 10 CU.; WATER TRUCK OVER 3,000 TO 5,000 GALLONS | $35.57 | $18.30 | $53.87 |
| TRUCK DRIVER GROUP 1 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: UP TO AND INCLUDING 10 CU. YDS; WATER TRUCK UP TO 3,000 GALLONS | $35.41 | $18.30 | $53.71 |
Highway OR20260001 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $49.60 | $25.15 | $74.75 |
| MILLWRIGHT | $59.35 | $22.38 | $81.73 |
| PILEDRIVER | $55.79 | $15.81 | $71.60 |
| CARPENTERS: EMPLOYEES MAY BE REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW, (EXCEPT FOR DIVE SUPERVISOR) PROVIDED THEY ARE PAID AT THE HIGHEST RATE OF PAY THAT THEY RECEIVED DURING THEIR SHIFT | $53.94 | $16.81 | $70.75 |
| ELECTRICIAN (CLACKAMAS, CLATSOP, COLUMBIA, HOOD RIVER, MULTNOMAH, TILLAMOOK, WASCO, WASHINGTON, SHERMAN AND YAMHILL (NORTH) COUNTIES) HOURLY ZONE PAY: HOURLY ZONE PAY SHALL BE PAID ON JOBS LOCATED OUTSIDE OF THE FREE ZONE COMPUTED FROM THE CITY CENTER OF THE FOLLOWING LISTED CITIES: PORTLAND, THE DALLES, HOOD RIVER, TILLAMOOK, SEASIDE AND ASTORIA ZONE PAY: MILES $3.50/HOUR ZONE 3: 71-90 MILES $5.50/HOUR ZONE 4: BEYOND 90 MILES $9.00/HOUR | $63.50 | $29.73 | $93.23 |
| CABLE SPLICER (CLACKAMAS, CLATSOP, COLUMBIA, HOOD RIVER, MULTNOMAH, TILLAMOOK, WASCO, WASHINGTON, SHERMAN AND YAMHILL (NORTH) COUNTIES) HOURLY ZONE PAY: HOURLY ZONE PAY SHALL BE PAID ON JOBS LOCATED OUTSIDE OF THE FREE ZONE COMPUTED FROM THE CITY CENTER OF THE FOLLOWING LISTED CITIES: PORTLAND, THE DALLES, HOOD RIVER, TILLAMOOK, SEASIDE AND ASTORIA ZONE PAY: MILES $3.50/HOUR ZONE 3: 71-90 MILES $5.50/HOUR ZONE 4: BEYOND 90 MILES $9.00/HOUR | $69.85 | $30.44 | $100.29 |
| ELECTRICIAN (BAKER, GILLIAM, GRANT, MORROW, UMATILLA, UNION, WALLOWA, AND WHEELER COUNTIES) | $60.00 | $27.78 | $87.78 |
| CABLE SPLICER (BAKER, GILLIAM, GRANT, MORROW, UMATILLA, UNION, WALLOWA, AND WHEELER COUNTIES) | $63.00 | $27.87 | $90.87 |
| CABLE SPLICER (BENTON, CROOK, DESCHUTES, JEFFERSON, LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY), LINN, MARION, POLK AND YAMHILL (SOUTHERN HALF) COUNTIES) | $60.80 | $22.24 | $83.04 |
| ELECTRICIAN (BENTON, CROOK, DESCHUTES, JEFFERSON, LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY), LINN, MARION, POLK AND YAMHILL (SOUTHERN HALF) COUNTIES) | $56.46 | $23.05 | $79.51 |
| CABLE SPLICER (BENTON, CROOK, DESCHUTES, JEFFERSON, LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY), LINN, MARION, POLK AND YAMHILL (SOUTHERN HALF) COUNTIES) | $60.80 | $22.24 | $83.04 |
| ELECTRICIAN (BENTON, CROOK, DESCHUTES, JEFFERSON, LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY), LINN, MARION, POLK AND YAMHILL (SOUTHERN HALF) COUNTIES) | $56.46 | $23.05 | $79.51 |
| ELECTRICIAN (MALHEUR COUNTY) | $42.55 | $19.86 | $62.41 |
| CABLE SPLICER (MALHEUR COUNTY) | $46.81 | $19.86 | $66.67 |
| CABLE SPLICER (DOUGLAS (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NE CORNER OF COOS COUNTY TO THE SE CORNER OF LINCOLN COUNTY), HARNEY, JACKSON, JOSEPHINE, KLAMATH AND LAKE COUNTIES) ZONE PAY: BASE POINTS ARE FROM THE DOWNTOWN POST OFFICE IN GRANTS PASS, KLAMATH FALLS, ROSEBURG AND MEDFORD. ZONE 1: 0-20 MILES MILES $5.00 PER HOUR ZONE 5: >50-60 MILES $6.80 PER HOUR ZONE 6: >60 MILES $9.50 PER HOUR | $64.58 | $23.31 | $87.89 |
| ELECTRICIAN (DOUGLAS (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NE CORNER OF COOS COUNTY TO THE SE CORNER OF LINCOLN COUNTY), HARNEY, JACKSON, JOSEPHINE, KLAMATH AND LAKE COUNTIES) ZONE PAY: BASE POINTS ARE FROM THE DOWNTOWN POST OFFICE IN GRANTS PASS, KLAMATH FALLS, ROSEBURG AND MEDFORD. ZONE 1: 0-20 MILES $0.00 PER HOUR ZONE 2: > 20-30 MILES MILES $6.80 PER HOUR ZONE 6: >60 MILES $9.50 PER HOUR | $47.04 | $21.84 | $68.88 |
| CABLE SPLICER (DOUGLAS (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NE CORNER OF COOS COUNTY TO THE SE CORNER OF LINCOLN COUNTY), HARNEY, JACKSON, JOSEPHINE, KLAMATH AND LAKE COUNTIES) ZONE PAY: BASE POINTS ARE FROM THE DOWNTOWN POST OFFICE IN GRANTS PASS, KLAMATH FALLS, ROSEBURG AND MEDFORD. ZONE 1: 0-20 MILES MILES $5.00 PER HOUR ZONE 5: >50-60 MILES $6.80 PER HOUR ZONE 6: >60 MILES $9.50 PER HOUR | $64.58 | $23.31 | $87.89 |
| ELECTRICIAN (DOUGLAS (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NE CORNER OF COOS COUNTY TO THE SE CORNER OF LINCOLN COUNTY), HARNEY, JACKSON, JOSEPHINE, KLAMATH AND LAKE COUNTIES) ZONE PAY: BASE POINTS ARE FROM THE DOWNTOWN POST OFFICE IN GRANTS PASS, KLAMATH FALLS, ROSEBURG AND MEDFORD. ZONE 1: 0-20 MILES $0.00 PER HOUR ZONE 2: > 20-30 MILES MILES $6.80 PER HOUR ZONE 6: >60 MILES $9.50 PER HOUR | $47.04 | $21.84 | $68.88 |
| ELECTRICIAN (COOS, CURRY, LINCOLN, DOUGLAS AND LANE COUNTIES (AREA LYING WEST OF A LINE NORTH AND SOUTH FROM THE N.E. CORNER OF COOS COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY)) | $50.03 | $24.00 | $74.03 |
| POWER EQUIPMENT OPERATOR GROUP 6 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE | $45.81 | $16.90 | $62.71 |
| POWER EQUIPMENT OPERATOR GROUP 5 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE | $49.03 | $16.90 | $65.93 |
| POWER EQUIPMENT OPERATOR GROUP 4 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE | $50.27 | $16.90 | $67.17 |
| POWER EQUIPMENT OPERATOR GROUP 3 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE | $53.60 | $16.90 | $70.50 |
| POWER EQUIPMENT OPERATOR GROUP 2 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE | $54.75 | $16.90 | $71.65 |
| POWER EQUIPMENT OPERATOR GROUP 1B (ZONE 1: POWER EQUIPMENT OPERATORS (SEE | $60.98 | $16.90 | $77.88 |
| POWER EQUIPMENT OPERATOR GROUP 1A (ZONE 1: POWER EQUIPMENT OPERATORS (SEE | $58.82 | $16.90 | $75.72 |
| POWER EQUIPMENT OPERATOR GROUP 1 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE | $56.66 | $16.90 | $73.56 |
| IRONWORKER | $48.31 | $34.52 | $82.83 |
| MASON TENDER/HOD CARRIER (TENDERS TO BRICKLAYERS, TILE SETTERS, MARBLE SETTERS AND TERRAZZO WORKERS, TOPPING FOR CEMENT FINISHERS AND MORTAR MIXERS) | $43.79 | $17.05 | $60.84 |
| LABORERS:: GROUP 3 (ZONE 1: LABORERS (SEE | $34.39 | $17.30 | $51.69 |
| LABORERS:: GROUP 2 (ZONE 1: LABORERS (SEE | $40.41 | $17.30 | $57.71 |
| LABORERS:: GROUP 1 (ZONE 1: LABORERS (SEE | $39.00 | $17.30 | $56.30 |
| PAINTER (HIGHWAY & PARKING LOT STRIPER) | $41.19 | $17.09 | $58.28 |
| PAINTER | $40.25 | $16.67 | $56.92 |
| CEMENT MASONS: COMPOSITION WORKERS AND POWER MACHINERY OPERATORS ZONE DIFFERENTIAL FOR CEMENT MASON - ADD TO BASIC HOURLY RATE FOR THE FOLLOWING CITIES: (REFERENCE CITY) BEND, PORTLAND, PENDLETON, MEDFORD, CORVALLIS, SALEM, EUGENE, THE DALLES, VANCOUVER WHEN A CONTRACTOR TAKES CURRENT EMPLOYEES TO A PROJECT THAT IS LOCATED MORE THAN 59 MILES FROM THE CITY HALL OF THE REFERENCE CITY THAT IS CLOSEST TO THE CONTRACTOR'S PLACE OF BUSINESS, ZONE PAY IS TO BE PAID FOR THE DISTANCE BETWEEN THE CITY HALL OF THE IDENTIFIED REFERENCE CITY AND THE PROJECT SITE, PER THE FOLLOWING: ZONE A - 60-79 MILES - ADDITIONAL $3.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATION AS LISTED IN SCHEDULE "A". ZONE B - 80-99 MILES - ADDITIONAL $5.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE "A" ZONE C -100 OR MORE MILES - ADDITIONAL $10.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE "A | $47.09 | $20.31 | $67.40 |
| CEMENT MASONS (ZONE1) ON SUSPENDED, SWINGING AND/OR HANGING SCAFFOLD ZONE DIFFERENTIAL FOR CEMENT MASON - ADD TO BASIC HOURLY RATE FOR THE FOLLOWING CITIES: BEND, PORTLAND, PENDLETON, MEDFORD, CORVALLIS, SALEM, EUGENE, THE DALLES, VANCOUVER WHEN A CONTRACTOR TAKES CURRENT EMPLOYEES TO A PROJECT THAT IS LOCATED MORE THAN 59 MILES FROM THE CITY HALL OF THE REFERENCE CITY THAT IS CLOSEST TO THE CONTRACTOR'S PLACE OF BUSINESS, ZONE PAY IS TO BE PAID FOR THE DISTANCE BETWEEN THE CITY HALL OF THE IDENTIFIED REFERENCE CITY AND THE PROJECT SITE, PER THE FOLLOWING: ZONE A - 60-79 MILES - ADDITIONAL $3.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATION AS LISTED IN SCHEDULE "A". ZONE B - 80-99 MILES - ADDITIONAL $5.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE "A" ZONE C -100 OR MORE MILES - ADDITIONAL $10.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE "A | $47.09 | $20.31 | $67.40 |
| CEMENT MASONS (ZONE 1) DOING BOTH COMPOSITION/POWER MACHINERY AND SUSPENDED/HANGING SCAFFOLD ZONE DIFFERENTIAL FOR CEMENT MASON - ADD TO BASIC HOURLY RATE FOR THE FOLLOWING CITIES: BEND, PORTLAND, PENDLETON, MEDFORD, CORVALLIS, SALEM, EUGENE, THE DALLES, VANCOUVER WHEN A CONTRACTOR TAKES CURRENT EMPLOYEES TO A PROJECT THAT IS LOCATED MORE THAN 59 MILES FROM THE CITY HALL OF THE REFERENCE CITY THAT IS CLOSEST TO THE CONTRACTOR'S PLACE OF BUSINESS, ZONE PAY IS TO BE PAID FOR THE DISTANCE BETWEEN THE CITY HALL OF THE IDENTIFIED REFERENCE CITY AND THE PROJECT SITE, PER THE FOLLOWING: ZONE A - 60-79 MILES - ADDITIONAL $3.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATION AS LISTED IN SCHEDULE "A". ZONE B - 80-99 MILES - ADDITIONAL $5.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE "A" ZONE C -100 OR MORE MILES - ADDITIONAL $10.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE "A | $48.05 | $20.31 | $68.36 |
| CEMENT MASON (ZONE1) ZONE DIFFERENTIAL FOR CEMENT MASON - ADD TO BASIC HOURLY RATE FOR THE FOLLOWING CITIES: (REFERENCE CITY) BEND, PORTLAND, PENDLETON, MEDFORD, CORVALLIS, SALEM, EUGENE, THE DALLES, VANCOUVER WHEN A CONTRACTOR TAKES CURRENT EMPLOYEES TO A PROJECT THAT IS LOCATED MORE THAN 59 MILES FROM THE CITY HALL OF THE REFERENCE CITY THAT IS CLOSEST TO THE CONTRACTOR'S PLACE OF BUSINESS, ZONE PAY IS TO BE PAID FOR THE DISTANCE BETWEEN THE CITY HALL OF THE IDENTIFIED REFERENCE CITY AND THE PROJECT SITE, PER THE FOLLOWING: ZONE A - 60-79 MILES - ADDITIONAL $3.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATION AS LISTED IN SCHEDULE "A". ZONE B - 80-99 MILES - ADDITIONAL $5.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE "A" ZONE C -100 OR MORE MILES - ADDITIONAL $10.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE "A" | $46.13 | $20.31 | $66.44 |
| TIMBER SALES ROADS: (TEAMSTERS) | $9.74 | $3.74 | $13.48 |
| TIMBER SALES ROADS: (POWER SAW, DRILLER, POWDERMAN) | $9.12 | $4.30 | $13.42 |
| TIMBER SALES ROADS: (OPERATING ENGINEERS) | $10.37 | $4.15 | $14.52 |
| TIMBER SALES ROADS: (LABORERS) | $8.35 | $4.30 | $12.65 |
TRUCK DRIVERS 7 classifications · $53.71 to $55.12 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVERS:: GROUP 7 (ZONE 1: TRUCK DRIVERS (SEE | $36.82 | $18.30 | $55.12 |
| TRUCK DRIVERS:: GROUP 6 (ZONE 1: TRUCK DRIVERS (SEE | $36.57 | $18.30 | $54.87 |
| TRUCK DRIVERS:: GROUP 5 (ZONE 1: TRUCK DRIVERS (SEE | $36.35 | $18.30 | $54.65 |
| TRUCK DRIVERS:: GROUP 4 (ZONE 1: TRUCK DRIVERS (SEE | $36.08 | $18.30 | $54.38 |
| TRUCK DRIVERS:: GROUP 3 (ZONE 1: TRUCK DRIVERS (SEE | $35.74 | $18.30 | $54.04 |
| TRUCK DRIVERS:: GROUP 2 (ZONE 1: TRUCK DRIVERS (SEE | $35.57 | $18.30 | $53.87 |
| TRUCK DRIVERS:: GROUP 1 (ZONE 1: TRUCK DRIVERS (SEE | $35.41 | $18.30 | $53.71 |
Residential OR20260005 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (DOUGLAS (THAT PORTION EAST OF THE COASTAL WATERSHED DIVIDE) COUNTY) | $33.41 | $18.20 | $51.61 |
| ELECTRICIAN (DOUGLAS (REMAINDER OF COUNTY)) | $39.34 | $22.45 | $61.79 |
| POWER EQUIPMENT OPERATOR GROUP 6 LOADERS: (LESS THAN 1 CU YD.); GRADE CHECKER; ROLLER (NON-ASPHALT) | $45.81 | $16.90 | $62.71 |
| POWER EQUIPMENT OPERATOR GROUP 5 ROLLER OPERATOR; BULLDOZERS: BULLDOZER OPERATOR, 20,000 LBS. OR LESS OR 100 HORSE OR LESS; HYDRAULIC HOES EXCAVATORS/TRACKHOE: HYDRAULIC BACKHOE OPERATOR, WHEEL TYPE (FORD, JOHN DEERE, CASE TYPE); HYDRAULIC BACKHOE OPERATOR TRACK TYPE UP TO AND INCLUDING 20,000 LBS.; LOADERS: LOADERS, RUBBER- TIRED TYPE, LESS THAN 25,000 LBS; CONCRETE PUMPER; CONCRETE PAVER | $49.03 | $16.90 | $65.93 |
| POWER EQUIPMENT OPERATOR GROUP 4 BULLDOZERS: BULLDOZER OPERATOR OVER 20,000 LBS AND MORE THAN 100 HORSE UP TO 70,000 LBS; HYDRAULIC HOES EXCAVATOR/TRACKHOE: ROBOTIC HYDRAULIC BACKHOE OPERATOR, TRACK AND WHEEL TYPE UP TO AND INCLUDING 20,0000 LBS. WITH ANY OR ALL ATTACHMENTS; EXCAVATOR OPERATOR OVER 20,000 LBS THROUGH 80,000 LBS.; LOADERS: LOADERS OPERATOR, FRONT END AND OVERHEAD, 25,000 LBS AND LESS THAN 60,000 LBS; RUBBER-TIRED DOZERS; ASPHALT PAVER; SCREED OPERATOR; BLADE OPERATOR; RUBBER-TIRED SCRAPER, SINGLE ENGINE, SINGLE SCRAPER | $50.27 | $16.90 | $67.17 |
| POWER EQUIPMENT OPERATOR GROUP 3 BULLDOZERS: BULLDOZER OPERATOR, OVER 70,000 LBS. UP TO AND INCLUDING 120,000 LBS.; HYDRAULIC HOES-EXCAVATOR: EXCAVATOR OVER 80,000 LBS. THROUGH 130,000 LBS.; LOADERS: LOADER OPERATOR 60,000 AND LESS THAN 120,000; RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS | $53.60 | $16.90 | $70.50 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZERS: BULLDOZER OPERATOR OVER 120,000 LBS AND ABOVE; BULLDOZER OPERATOR, TWIN ENGINE; BULLDOZER OPERATOR,TANDEM, QUADNINE, D10, D11, AND SIMILAR TYPE; LOADERS: LOADER OPERATOR, 120,000 LBS. AND ABOVE; HYDRAULIC HOES-EXCAVATOR: EXCAVATOR OVER 130,000 LBS; BLADE OPERATOR-ROBOTIC; RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS, MULTI-ENGINE | $54.75 | $16.90 | $71.65 |
| LABORERS: (MASON TENDER-CEMENT/CONCRETE) | $43.79 | $17.05 | $60.84 |
| LABORERS: (GENERAL LABORER) | $39.00 | $17.30 | $56.30 |
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 |
| ROOFER | $14.41 | $0.00 | $14.41 |
| CARPENTER, EXCLUDES FORM WORK | $19.99 | $7.78 | $27.77 |
TRUCK DRIVERS 7 classifications · $53.71 to $55.12 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVERS: GROUP 7 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 80 CU. YDS. AND INCLUDING 100 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS | $36.82 | $18.30 | $55.12 |
| TRUCK DRIVERS: GROUP 6 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 60 CU. YDS. AND INCLUDING 80 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.57 | $18.30 | $54.87 |
| TRUCK DRIVERS: GROUP 5 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 50 CU. YDS. AND INCLUDING 60 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.35 | $18.30 | $54.65 |
| TRUCK DRIVERS: GROUP 4 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 30 CU. YDS. AND INCLUDING 50 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.08 | $18.30 | $54.38 |
| TRUCK DRIVERS: GROUP 3 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 10 CU. YDS. AND INCLUDING 30 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS | $35.74 | $18.30 | $54.04 |
| TRUCK DRIVERS: GROUP 2 DUMP TRCUKS/ARTICULATED DUMPS 6 CU TO 10 CU.; | $35.57 | $18.30 | $53.87 |
| TRUCK DRIVERS: GROUP 1 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: UP TO AND INCLUDING 10 CU. YDS | $35.41 | $18.30 | $53.71 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.