McClain County, Oklahoma: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building OK20260048 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $26.92 | $13.09 | $40.01 |
| MILLWRIGHT | $29.15 | $11.81 | $40.96 |
| CARPENTER (FORM WORK ONLY) | $27.79 | $10.05 | $37.84 |
| ELECTRICIAN | $41.40 | $13.14 | $54.54 |
| ELECTRICIAN (LOW VOLTAGE WIRING AND ALARM INSTALLATION ONLY) | $24.26 | $9.76 | $34.02 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $51.11 | $38.44 | $89.55 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $32.10 | $17.38 | $49.48 |
| PLUMBER (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $41.00 | $16.03 | $57.03 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION, EXCLUDING HVAC UNIT INSTALLATION) | $41.00 | $16.03 | $57.03 |
| ROOFER | $26.30 | $10.34 | $36.64 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $39.05 | $25.77 | $64.82 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $33.38 | $16.36 | $49.74 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | $11.60 | $0.00 | $11.60 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $19.45 | $6.38 | $25.83 |
| PLASTERER | $17.50 | $0.00 | $17.50 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.17 | $0.00 | $12.17 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $13.38 | $1.54 | $14.92 |
| OPERATOR: LOADER (FRONT END) | $16.18 | $0.00 | $16.18 |
| OPERATOR: GRADER/BLADE | $14.28 | $1.70 | $15.98 |
| OPERATOR: BULLDOZER | $20.64 | $2.35 | $22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.25 | $4.35 | $25.60 |
| IRONWORKER, REINFORCING | $17.11 | $0.00 | $17.11 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $21.64 | $6.46 | $28.10 |
| GLAZIER | $12.02 | $2.42 | $14.44 |
| FENCE ERECTOR | $16.00 | $0.00 | $16.00 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $14.08 | $0.00 | $14.08 |
| DRYWALL FINISHER/TAPER | $14.25 | $0.00 | $14.25 |
| CEMENT MASON/CONCRETE FINISHER | $16.72 | $0.00 | $16.72 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.31 | $2.96 | $19.27 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $14.45 | $0.00 | $14.45 |
POWER EQUIPMENT OPERATOR 6 classifications · $46.30 to $57.14 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 |
LABORER 6 classifications · $11.40 to $14.91 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: PLASTER TENDER | $12.00 | $0.00 | $12.00 |
| LABORER: PIPELAYER | $12.39 | $0.00 | $12.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $1.91 | $14.91 |
| LABORER: MASON TENDER - BRICK | $12.00 | $0.00 | $12.00 |
| LABORER: LANDSCAPE | $13.75 | $0.00 | $13.75 |
| LABORER: COMMON OR GENERAL | $11.40 | $0.00 | $11.40 |
Heavy OK20260029 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (STRUCTURAL, REINFORCING, AND ORNAMENTAL) | $32.10 | $17.38 | $49.48 |
| TRUCK DRIVER: DUMP TRUCK | $16.50 | $0.74 | $17.24 |
| LABORER: PIPELAYER | $11.13 | $0.00 | $11.13 |
| LABORER: COMMON OR GENERAL | $11.81 | $1.09 | $12.90 |
| FORM WORKER | $11.77 | $0.00 | $11.77 |
| ELECTRICIAN | $22.00 | $4.76 | $26.76 |
| CEMENT MASON/CONCRETE FINISHER | $12.49 | $1.23 | $13.72 |
POWER EQUIPMENT OPERATOR 6 classifications · $46.30 to $57.14 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 6 ROLLER (ASPHALT AND DIRT) | $30.87 | $19.05 | $49.92 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 |
OPERATOR 7 classifications · $13.51 to $29.00 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: TRACKHOE | $17.50 | $2.78 | $20.28 |
| OPERATOR: SCRAPER | $16.00 | $1.55 | $17.55 |
| OPERATOR: MECHANIC | $19.61 | $9.39 | $29.00 |
| OPERATOR: LOADER (FRONT END) | $13.51 | $0.00 | $13.51 |
| OPERATOR: GRADER/BLADE | $17.76 | $3.87 | $21.63 |
| OPERATOR: DRILL | $17.15 | $0.78 | $17.93 |
| OPERATOR: BACKHOE/EXCAVATOR | $18.17 | $6.28 | $24.45 |
Highway OK20260022 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (REMAINING COUNTIES) | $13.72 | $0.00 | $13.72 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (CLEVELAND COUNTY) | $12.37 | $0.00 | $12.37 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (CANADIAN COUNTY) | $12.00 | $0.00 | $12.00 |
| TRUCK DRIVER: DUMP TRUCK (REMAINING COUNTIES) | $12.88 | $0.00 | $12.88 |
| TRUCK DRIVER: DUMP TRUCK (CLEVELAND COUNTY) | $12.32 | $0.00 | $12.32 |
| TRUCK DRIVER (WATER TRUCK) | $12.00 | $0.00 | $12.00 |
| TRUCK DRIVER (PICKUP TRUCK) | $12.48 | $0.00 | $12.48 |
| TRUCK DRIVER (OFF THE ROAD TRUCK) | $13.75 | $0.00 | $13.75 |
| TRUCK DRIVER (LOWBOY/FLOAT) | $13.90 | $0.00 | $13.90 |
| TRUCK DRIVER (FLATBED TRUCK) | $14.69 | $0.00 | $14.69 |
| TRAFFIC SIGNAL INSTALLER | $17.37 | $0.00 | $17.37 |
| LABORER, COMMON OR GENERAL (MCCLAIN COUNTY) | $10.37 | $0.00 | $10.37 |
| LABORER, COMMON OR GENERAL (LINCOLN COUNTY) | $10.17 | $0.00 | $10.17 |
| LABORER, COMMON OR GENERAL (GRADY AND LOGAN COUNTIES) | $10.55 | $0.00 | $10.55 |
| LABORER, COMMON OR GENERAL (CLEVELAND COUNTY) | $10.62 | $0.00 | $10.62 |
| LABORER, COMMON OR GENERAL (CANADIAN COUNTY) | $10.05 | $0.00 | $10.05 |
| LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS)) | $11.12 | $0.00 | $11.12 |
| LABORER (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS)) | $12.89 | $0.00 | $12.89 |
| LABORER (PIPELAYER) | $12.50 | $0.00 | $12.50 |
| LABORER (LANDSCAPE) | $9.63 | $0.00 | $9.63 |
| LABORER (ASPHALT RAKER AND SHOVELER) | $11.31 | $0.00 | $11.31 |
| IRONWORKER: REINFORCING | $13.63 | $0.00 | $13.63 |
| IRONWORKER, STRUCTURAL | $14.21 | $0.00 | $14.21 |
| CEMENT MASON/CONCRETE FINISHER (MCCLAIN) | $11.93 | $0.00 | $11.93 |
| CEMENT MASON/CONCRETE FINISHER (GRADY, LINCOLN, LOGAN) | $12.47 | $0.00 | $12.47 |
| CEMENT MASON/CONCRETE FINISHER (CLEVELAND) | $12.55 | $0.00 | $12.55 |
| CEMENT MASON/CONCRETE FINISHER (CANADIAN) | $12.44 | $0.00 | $12.44 |
| CARPENTER (INCLUDES FORM WORK) | $13.32 | $0.00 | $13.32 |
POWER EQUIPMENT OPERATOR 38 classifications · $11.64 to $16.99 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: SCRAPER (REMAINING COUNTIES) | $13.19 | $0.00 | $13.19 |
| POWER EQUIPMENT OPERATOR: SCRAPER (CLEVELAND COUNTY) | $13.06 | $0.00 | $13.06 |
| POWER EQUIPMENT OPERATOR: SCRAPER (CANADIAN COUNTY) | $12.00 | $0.00 | $12.00 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (REMAINING COUNTIES) | $12.73 | $0.00 | $12.73 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (MCCLAIN COUNTY) | $12.94 | $0.00 | $12.94 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (CLEVELAND COUNTY) | $12.86 | $0.00 | $12.86 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (CANADIAN COUNTY) | $11.67 | $0.00 | $11.67 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (REMAINING COUNTIES) | $12.85 | $0.00 | $12.85 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (CLEVELAND COUNTY) | $12.76 | $0.00 | $12.76 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (REMAINING COUNTIES) | $14.98 | $0.00 | $14.98 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (CLEVELAND COUNTY) | $14.46 | $0.00 | $14.46 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (CANADIAN COUNTY) | $12.00 | $0.00 | $12.00 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW (REMAINING COUNTIES) | $11.70 | $0.00 | $11.70 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW (CLEVELAND COUNTY) | $11.64 | $0.00 | $11.64 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (REMAINING COUNTIES) | $14.24 | $0.00 | $14.24 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (MCCLAIN COUNTY) | $13.36 | $0.00 | $13.36 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (REMAINING COUNTIES) | $13.64 | $0.00 | $13.64 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (CLEVELAND COUNTY) | $12.91 | $0.00 | $12.91 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (REMAINING COUNTIES) | $14.08 | $0.00 | $14.08 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (MCCLAIN COUNTY) | $14.04 | $0.00 | $14.04 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (CLEVELAND COUNTY) | $14.57 | $0.00 | $14.57 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (CANADIAN COUNTY) | $13.32 | $0.00 | $13.32 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $13.63 | $0.00 | $13.63 |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) | $16.50 | $0.00 | $16.50 |
| POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) | $12.56 | $0.00 | $12.56 |
| POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION)) | $12.27 | $0.00 | $12.27 |
| POWER EQUIPMENT OPERATOR: (OILER) | $14.06 | $0.00 | $14.06 |
| POWER EQUIPMENT OPERATOR: (MIXER) | $14.43 | $0.00 | $14.43 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $14.93 | $0.00 | $14.93 |
| POWER EQUIPMENT OPERATOR: (MECHANIC) | $15.60 | $0.00 | $15.60 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) | $15.10 | $0.00 | $15.10 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) | $13.81 | $0.00 | $13.81 |
| POWER EQUIPMENT OPERATOR: (CRANE) | $16.99 | $0.00 | $16.99 |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE) | $13.61 | $0.00 | $13.61 |
| POWER EQUIPMENT OPERATOR: (BROOM) | $11.97 | $0.00 | $11.97 |
| POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER) | $12.71 | $0.00 | $12.71 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PLANT) | $14.70 | $0.00 | $14.70 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) | $12.44 | $0.00 | $12.44 |
Residential OK20260076 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $25.92 | $11.89 | $37.81 |
| PLUMBER | $33.14 | $0.00 | $33.14 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.02 | $10.00 | $27.02 |
| LABORER: COMMON OR GENERAL | $13.00 | $0.00 | $13.00 |
| IRONWORKER, STRUCTURAL | $17.10 | $4.22 | $21.32 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | $30.08 | $12.42 | $42.50 |
| HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) | $27.20 | $14.32 | $41.52 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $19.62 | $0.00 | $19.62 |
| CEMENT MASON/CONCRETE FINISHER | $18.57 | $0.00 | $18.57 |
| CARPENTER | $14.18 | $0.00 | $14.18 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.