Building NY20260045 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM) | $38.50 | $25.04 | $63.54 |
| ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.) | $43.25 | $27.29 | $70.54 |
| HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM) | $38.50 | $25.04 | $63.54 |
| ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.) | $43.25 | $27.29 | $70.54 |
| BOILERMAKER | $43.34 | $27.66 | $71.00 |
| MARBLE MASONS, TILE LAYER, TERRAZZO WORKER: BUILDING CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS AND TIOGA)) | $34.34 | $28.46 | $62.80 |
| CEMENT MASONS: HEAVY & HIGHWAY CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS AND TIOGA)) | $38.63 | $25.05 | $63.68 |
| BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, TILE SETTERS, TERRAZZO WORKERS, MARBLE MASONS, POINTERS, CAULKERS AND CLEANERS: BUILDING CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS AND TIOGA)) | $34.34 | $28.46 | $62.80 |
| CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (BINGHAMTON CHAPTER TIOGA COUNTY (TOWNSHIPS OF BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD, PARTS OF CANDOR, NICHOLS AND TIOGA)) | $38.63 | $25.05 | $63.68 |
| CEMENT MASON/CONCRETE FINISHER (HEAVY & HIGHWAY CONSTRUCTION) | $38.63 | $25.05 | $63.68 |
| BRICKLAYER (BUILDING CONSTRUCTION MARBLE, TILE AND TERRAZZO FINISHERS) | $34.44 | $20.38 | $54.82 |
| BRICKLAYER (BUILDING CONSTRUCTION BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, TILE SETTERS, TERRAZZO WORKERS, MARBLE MASONS, POINTERS, CAULKERS, TUCKERS) | $34.34 | $28.46 | $62.80 |
| MILLWRIGHT BUILDING CONSTRUCTION | $31.69 | $21.92 | $53.61 |
| CARPENTERS: (HEAVY & HIGHWAY CONSTRUCTION) | $39.52 | $27.16 | $66.68 |
| CARPENTER BUILDING CONSTRUCTION | $31.69 | $21.92 | $53.61 |
| ELECTRICIAN (BARTON AND NICHOLS TOWNSHIPS) | $43.40 | $31.72 | $75.12 |
| ELECTRICIAN (CANDOR AND SPENCER TOWNSHIPS) | $44.50 | $31.89 | $76.39 |
| ELECTRICIAN (BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD AND TIOGA TOWNSHIPS) | $42.68 | $33.06 | $75.74 |
| CABLE SPLICER (BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD AND TIOGA TOWNSHIPS) | $50.43 | $33.29 | $83.72 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC | $42.29 | $30.66 | $72.95 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN | $52.86 | $35.60 | $88.46 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) | $47.57 | $31.03 | $78.60 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) | $42.29 | $30.66 | $72.95 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN | $31.72 | $29.87 | $61.59 |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $38.73 | $6.93 | $45.66 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $20.53 | $6.39 | $26.92 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.81 | $6.99 | $47.80 |
| ELEVATOR MECHANIC | $58.44 | $38.44 | $96.88 |
| POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCKS OVER 5 TONS BUILDING HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY | $51.71 | $32.80 | $84.51 |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, SELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4" AND OVER, MURPHY TYPE DISEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELTCRETE POWER PACK (BELCRETE SYSTEM SEEDING AND MULCHING MACHINES PUMPS. HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. | $46.54 | $32.80 | $79.34 |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP B BACKHOES (RUBBER TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDRO HAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOISTING (SINGLE DRUM), HOIST TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORE AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBROTAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. | $48.85 | $32.80 | $81.65 |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE, FULL SWING), GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT, TRACTOR ROAD PAVER, BOOM TRUCKS 5 TONS AND UNDER, MAINTENANCE ENGINEER, SELF CONTAINED CRAWLER DRILL-HYDRAULIC ROCK DRILL. HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. | $49.31 | $32.80 | $82.11 |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | $33.55 | $87.37 |
| TRUCK DRIVER GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY TRAILERS; SEMI TRAILERS; ASPHALT DISTRIBUTORS; FUEL TRUCK | $26.52 | $15.91 | $42.43 |
| IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRICKMAN, WELDER, SHEETER, SHEETER BUCKER-UP) | $37.16 | $30.68 | $67.84 |
| LABORER: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL REMAINDER OF COUNTY | $38.76 | $25.60 | $64.36 |
| LABORER: HEAVY & HIGHWAY: GROUP 4: BLASTERS; FORM SETTERS; STONE OR GRANITE CURB SETTERS REMAINDER OF COUNTY | $35.76 | $25.60 | $61.36 |
| LABORER: HEAVY & HIGHWAY: GROUP 3: ALL ROCK OR DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN REMAINDER OF COUNTY | $35.96 | $25.60 | $61.56 |
| LABORER: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER; MORTAR MIXER; PAVEMENT BREAKER; HANDLERS OF ALL STEEL MESH; SMALL GENERATORS FOR LABORERS' TOOLS; INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE ROLLERS; TAMPERS; DRILL DOCTOR; TAIL OR SCREW OPERATOR ON ASPHALT PAVER; WATER PUMP OPERATOR (1-1/2" AND SINGLE DIAPHRAM); NOZZLE (ASPHALT, GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING LABORERS REMAINDER OF COUNTY | $36.16 | $25.60 | $61.76 |
| LABORER: HEAVY & HIGHWAY: GROUP 1: LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS REMAINDER OF COUNTY | $35.56 | $25.60 | $61.16 |
| GLAZIER | $30.00 | $31.95 | $61.95 |
| PLUMBER, INCLUDING STEAMFITTING (TOWNSHIPS OF NEWARK VALLEY AND OWEGO) | $44.91 | $33.31 | $78.22 |
| PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK (THE TOWNS OF BARTON, BERKSHIRE, CANDOR, NICHOLS, RICHFORD, SPENCER AND TIOGA) | $35.51 | $24.57 | $60.08 |
| ROOFER | $30.50 | $19.84 | $50.34 |
| SPRINKLER FITTER | $47.85 | $28.94 | $76.79 |
| SHEET METAL WORKER | $35.94 | $20.89 | $56.83 |
| TRUCK DRIVER GROUP 2 DUMP TRUCK (OVER 10 YDS); TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND VAC TRUCKS; DUMPSTER (TANDEM) | $26.03 | $15.91 | $41.94 |
| TRUCK DRIVER GROUP 1 FLAT BED TRUCK (SINGLE AXLE); DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE) | $25.96 | $15.91 | $41.87 |
ELECTRICIAN, LINE CONSTRUCTION 17 classifications · $65.46 to $107.51 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation) | $63.14 | $33.82 | $96.96 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities ) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation) | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities ) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities ) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities ) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities ) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | $107.51 |
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY) 6 classifications · $89.94 to $96.85 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC | $58.91 | $33.55 | $92.46 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW | $60.30 | $33.55 | $93.85 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER | $61.80 | $33.55 | $95.35 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES | $63.30 | $33.55 | $96.85 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT | $56.39 | $33.55 | $89.94 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL | $57.30 | $33.55 | $90.85 |
LABORERS 8 classifications · $48.96 to $64.36 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: HEAVY AND HIGHWAY GROUP 5: HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $38.76 | $25.60 | $64.36 |
| LABORERS: HEAVY AND HIGHWAY GROUP 4: BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $36.16 | $25.60 | $61.76 |
| LABORERS: HEAVY AND HIGHWAY GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $35.96 | $25.60 | $61.56 |
| LABORERS: HEAVY AND HIGHWAY GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2' AND SINGLE DIAPHRAM), NOZZLE (ASPHALT GUNNITE, SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OPERATOR (1 1/2' AND SINGLE DEAPHRAM), NOZZLER (ASPHALT GUNNITE, SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, OTHER GAS ELECTRIC, OIL AND AIR TOOL OPERATORS, WRECKING LABORERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $35.76 | $25.60 | $61.36 |
| LABORERS: HEAVY AND HIGHWAY GROUP 1: COMMON LABORERS, FLAGGERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $35.56 | $25.60 | $61.16 |
| LABORERS: GROUP 3 (BUILDING) ASBESTOS ABATEMENT AND HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $28.50 | $22.46 | $50.96 |
| LABORERS: GROUP 2 (BUILDING) MASONARY FORKLIFTS, BOB CATS, ROCK DRILLING EQUIPMENT, BLASTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $28.50 | $22.46 | $50.96 |
| LABORERS: GROUP 1 (BUILDING) BASIC LABORER TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $26.50 | $22.46 | $48.96 |
PAINTERS 6 classifications · $52.93 to $53.83 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: (SWING SCAFFOLD, BOATSWAIN CHAIR, SPRAY, SANDBLASTING, STEAM CLEANING, ACID AND HIGH PRESSURE WATER, PAPERHANGERS, VINYL HANGERS, POWER GRINDERS W/RESPIRATOR) | $29.10 | $23.83 | $52.93 |
| PAINTERS: (STRUCTURAL STEEL (BUILDINGS) SPRAY WORK) | $29.10 | $23.83 | $52.93 |
| PAINTERS: (SPRAY WORK/STEEPLE JACK (OVER 100 FT)) | $29.50 | $23.83 | $53.33 |
| PAINTERS: (SPRAY EPOXY) | $30.00 | $23.83 | $53.83 |
| PAINTERS: (PAINTERS AND TAPERS) | $29.93 | $23.83 | $53.76 |
| PAINTERS: (EPOXY-BRUSH & ROLLER) | $29.60 | $23.83 | $53.43 |
Heavy NY20260001 rev 2
DREDGING 7 classifications · $45.01 to $63.82 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $30.86 | $14.15 | $45.01 |
| DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $37.15 | $14.57 | $51.72 |
| DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $38.38 | $14.66 | $53.04 |
| DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $39.46 | $14.73 | $54.19 |
| DREDGING: CLASS B1: DERRICK OPERATOR (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $41.93 | $14.90 | $56.83 |
| DREDGING: CLASS A2: CRANE OPERATOR (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $43.20 | $14.99 | $58.19 |
| DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $48.48 | $15.34 | $63.82 |
Highway NY20260045 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM) | $38.50 | $25.04 | $63.54 |
| ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.) | $43.25 | $27.29 | $70.54 |
| HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM) | $38.50 | $25.04 | $63.54 |
| ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.) | $43.25 | $27.29 | $70.54 |
| BOILERMAKER | $43.34 | $27.66 | $71.00 |
| MARBLE MASONS, TILE LAYER, TERRAZZO WORKER: BUILDING CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS AND TIOGA)) | $34.34 | $28.46 | $62.80 |
| CEMENT MASONS: HEAVY & HIGHWAY CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS AND TIOGA)) | $38.63 | $25.05 | $63.68 |
| BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, TILE SETTERS, TERRAZZO WORKERS, MARBLE MASONS, POINTERS, CAULKERS AND CLEANERS: BUILDING CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS AND TIOGA)) | $34.34 | $28.46 | $62.80 |
| CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (BINGHAMTON CHAPTER TIOGA COUNTY (TOWNSHIPS OF BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD, PARTS OF CANDOR, NICHOLS AND TIOGA)) | $38.63 | $25.05 | $63.68 |
| CEMENT MASON/CONCRETE FINISHER (HEAVY & HIGHWAY CONSTRUCTION) | $38.63 | $25.05 | $63.68 |
| BRICKLAYER (BUILDING CONSTRUCTION MARBLE, TILE AND TERRAZZO FINISHERS) | $34.44 | $20.38 | $54.82 |
| BRICKLAYER (BUILDING CONSTRUCTION BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, TILE SETTERS, TERRAZZO WORKERS, MARBLE MASONS, POINTERS, CAULKERS, TUCKERS) | $34.34 | $28.46 | $62.80 |
| MILLWRIGHT BUILDING CONSTRUCTION | $31.69 | $21.92 | $53.61 |
| CARPENTERS: (HEAVY & HIGHWAY CONSTRUCTION) | $39.52 | $27.16 | $66.68 |
| CARPENTER BUILDING CONSTRUCTION | $31.69 | $21.92 | $53.61 |
| ELECTRICIAN (BARTON AND NICHOLS TOWNSHIPS) | $43.40 | $31.72 | $75.12 |
| ELECTRICIAN (CANDOR AND SPENCER TOWNSHIPS) | $44.50 | $31.89 | $76.39 |
| ELECTRICIAN (BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD AND TIOGA TOWNSHIPS) | $42.68 | $33.06 | $75.74 |
| CABLE SPLICER (BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD AND TIOGA TOWNSHIPS) | $50.43 | $33.29 | $83.72 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC | $42.29 | $30.66 | $72.95 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN | $52.86 | $35.60 | $88.46 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) | $47.57 | $31.03 | $78.60 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) | $42.29 | $30.66 | $72.95 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN | $31.72 | $29.87 | $61.59 |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $38.73 | $6.93 | $45.66 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $20.53 | $6.39 | $26.92 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.81 | $6.99 | $47.80 |
| ELEVATOR MECHANIC | $58.44 | $38.44 | $96.88 |
| POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCKS OVER 5 TONS BUILDING HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY | $51.71 | $32.80 | $84.51 |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, SELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4" AND OVER, MURPHY TYPE DISEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELTCRETE POWER PACK (BELCRETE SYSTEM SEEDING AND MULCHING MACHINES PUMPS. HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. | $46.54 | $32.80 | $79.34 |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP B BACKHOES (RUBBER TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDRO HAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOISTING (SINGLE DRUM), HOIST TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORE AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBROTAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. | $48.85 | $32.80 | $81.65 |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE, FULL SWING), GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT, TRACTOR ROAD PAVER, BOOM TRUCKS 5 TONS AND UNDER, MAINTENANCE ENGINEER, SELF CONTAINED CRAWLER DRILL-HYDRAULIC ROCK DRILL. HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. | $49.31 | $32.80 | $82.11 |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | $33.55 | $87.37 |
| TRUCK DRIVER GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY TRAILERS; SEMI TRAILERS; ASPHALT DISTRIBUTORS; FUEL TRUCK | $26.52 | $15.91 | $42.43 |
| IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRICKMAN, WELDER, SHEETER, SHEETER BUCKER-UP) | $37.16 | $30.68 | $67.84 |
| LABORER: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL REMAINDER OF COUNTY | $38.76 | $25.60 | $64.36 |
| LABORER: HEAVY & HIGHWAY: GROUP 4: BLASTERS; FORM SETTERS; STONE OR GRANITE CURB SETTERS REMAINDER OF COUNTY | $35.76 | $25.60 | $61.36 |
| LABORER: HEAVY & HIGHWAY: GROUP 3: ALL ROCK OR DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN REMAINDER OF COUNTY | $35.96 | $25.60 | $61.56 |
| LABORER: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER; MORTAR MIXER; PAVEMENT BREAKER; HANDLERS OF ALL STEEL MESH; SMALL GENERATORS FOR LABORERS' TOOLS; INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE ROLLERS; TAMPERS; DRILL DOCTOR; TAIL OR SCREW OPERATOR ON ASPHALT PAVER; WATER PUMP OPERATOR (1-1/2" AND SINGLE DIAPHRAM); NOZZLE (ASPHALT, GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING LABORERS REMAINDER OF COUNTY | $36.16 | $25.60 | $61.76 |
| LABORER: HEAVY & HIGHWAY: GROUP 1: LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS REMAINDER OF COUNTY | $35.56 | $25.60 | $61.16 |
| GLAZIER | $30.00 | $31.95 | $61.95 |
| PLUMBER, INCLUDING STEAMFITTING (TOWNSHIPS OF NEWARK VALLEY AND OWEGO) | $44.91 | $33.31 | $78.22 |
| PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK (THE TOWNS OF BARTON, BERKSHIRE, CANDOR, NICHOLS, RICHFORD, SPENCER AND TIOGA) | $35.51 | $24.57 | $60.08 |
| ROOFER | $30.50 | $19.84 | $50.34 |
| SPRINKLER FITTER | $47.85 | $28.94 | $76.79 |
| SHEET METAL WORKER | $35.94 | $20.89 | $56.83 |
| TRUCK DRIVER GROUP 2 DUMP TRUCK (OVER 10 YDS); TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND VAC TRUCKS; DUMPSTER (TANDEM) | $26.03 | $15.91 | $41.94 |
| TRUCK DRIVER GROUP 1 FLAT BED TRUCK (SINGLE AXLE); DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE) | $25.96 | $15.91 | $41.87 |
ELECTRICIAN, LINE CONSTRUCTION 17 classifications · $65.46 to $107.51 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation) | $63.14 | $33.82 | $96.96 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities ) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation) | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities ) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities ) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities ) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities ) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | $107.51 |
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY) 6 classifications · $89.94 to $96.85 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC | $58.91 | $33.55 | $92.46 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW | $60.30 | $33.55 | $93.85 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER | $61.80 | $33.55 | $95.35 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES | $63.30 | $33.55 | $96.85 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT | $56.39 | $33.55 | $89.94 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL | $57.30 | $33.55 | $90.85 |
LABORERS 8 classifications · $48.96 to $64.36 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: HEAVY AND HIGHWAY GROUP 5: HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $38.76 | $25.60 | $64.36 |
| LABORERS: HEAVY AND HIGHWAY GROUP 4: BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $36.16 | $25.60 | $61.76 |
| LABORERS: HEAVY AND HIGHWAY GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $35.96 | $25.60 | $61.56 |
| LABORERS: HEAVY AND HIGHWAY GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2' AND SINGLE DIAPHRAM), NOZZLE (ASPHALT GUNNITE, SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OPERATOR (1 1/2' AND SINGLE DEAPHRAM), NOZZLER (ASPHALT GUNNITE, SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, OTHER GAS ELECTRIC, OIL AND AIR TOOL OPERATORS, WRECKING LABORERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $35.76 | $25.60 | $61.36 |
| LABORERS: HEAVY AND HIGHWAY GROUP 1: COMMON LABORERS, FLAGGERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $35.56 | $25.60 | $61.16 |
| LABORERS: GROUP 3 (BUILDING) ASBESTOS ABATEMENT AND HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $28.50 | $22.46 | $50.96 |
| LABORERS: GROUP 2 (BUILDING) MASONARY FORKLIFTS, BOB CATS, ROCK DRILLING EQUIPMENT, BLASTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $28.50 | $22.46 | $50.96 |
| LABORERS: GROUP 1 (BUILDING) BASIC LABORER TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS | $26.50 | $22.46 | $48.96 |
PAINTERS 6 classifications · $52.93 to $53.83 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: (SWING SCAFFOLD, BOATSWAIN CHAIR, SPRAY, SANDBLASTING, STEAM CLEANING, ACID AND HIGH PRESSURE WATER, PAPERHANGERS, VINYL HANGERS, POWER GRINDERS W/RESPIRATOR) | $29.10 | $23.83 | $52.93 |
| PAINTERS: (STRUCTURAL STEEL (BUILDINGS) SPRAY WORK) | $29.10 | $23.83 | $52.93 |
| PAINTERS: (SPRAY WORK/STEEPLE JACK (OVER 100 FT)) | $29.50 | $23.83 | $53.33 |
| PAINTERS: (SPRAY EPOXY) | $30.00 | $23.83 | $53.83 |
| PAINTERS: (PAINTERS AND TAPERS) | $29.93 | $23.83 | $53.76 |
| PAINTERS: (EPOXY-BRUSH & ROLLER) | $29.60 | $23.83 | $53.43 |
Residential NY20260093 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $25.38 | $12.02 | $37.40 |
| CARPENTER | $31.59 | $23.24 | $54.83 |
| IRONWORKER, STRUCTURAL | $35.75 | $30.80 | $66.55 |
| IRONWORKER, ORNAMENTAL A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY | $42.63 | $53.70 | $96.33 |
| PAINTER: BRUSH AND ROLLER | $23.25 | $21.21 | $44.46 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $17.41 | $2.46 | $19.87 |
| ROOFER | $14.96 | $0.00 | $14.96 |
| PLUMBER | $22.71 | $0.00 | $22.71 |
| OPERATOR: LOADER | $27.88 | $21.40 | $49.28 |
| OPERATOR: BULLDOZER | $20.80 | $0.00 | $20.80 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.36 | $0.00 | $21.36 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $19.69 | $0.00 | $19.69 |
| LABORER: MASON TENDER - BRICK | $18.03 | $0.00 | $18.03 |
| LABORER: COMMON OR GENERAL | $15.35 | $0.00 | $15.35 |
| IRONWORKER, REINFORCING | $27.06 | $23.02 | $50.08 |
| ELECTRICIAN | $26.08 | $12.92 | $39.00 |
| CEMENT MASON/CONCRETE FINISHER | $21.30 | $13.27 | $34.57 |