| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | $61.45 |
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 |
| BOILERMAKER | $68.88 | $49.83 | $118.71 |
| MASON - STONE | $69.91 | $44.02 | $113.93 |
| BRICKLAYER | $67.39 | $35.90 | $103.29 |
| POINTER, CLEANER AND CAULKER | $63.69 | $32.42 | $96.11 |
| MARBLE MASON | $63.92 | $40.20 | $104.12 |
| TERRAZZO WORKER/SETTER | $64.62 | $37.63 | $102.25 |
| TERRAZZO FINISHER | $49.59 | $34.25 | $83.84 |
| TILE FINISHER | $49.59 | $34.25 | $83.84 |
| MARBLE FINISHER | $49.99 | $37.54 | $87.53 |
| BRICKLAYER (MARBLE POLISHERS) | $52.32 | $36.25 | $88.57 |
| TILE LAYER | $64.40 | $37.13 | $101.53 |
| CARPENTER, BUILDING & RESIDENTIAL (RICHMOND COUNTY) | $59.05 | $48.08 | $107.13 |
| CARPENTER: HEAVY & HIGHWAY (RICHMOND COUNTY) | $61.59 | $55.84 | $117.43 |
| CARPENTER, BUILDING & RESIDENTIAL (QUEENS COUNTY) | $59.05 | $48.08 | $107.13 |
| CARPENTER: HEAVY & HIGHWAY (QUEENS COUNTY) | $61.59 | $55.84 | $117.43 |
| CARPENTER, BUILDING & RESIDENTIAL (BRONX AND NEW YORK COUNTIES) | $59.05 | $48.08 | $107.13 |
| CARPENTER: HEAVY & HIGHWAY (BRONX AND NEW YORK COUNTIES) | $61.59 | $55.84 | $117.43 |
| MILLWRIGHT | $60.83 | $58.03 | $118.86 |
| CARPENTER, BUILDING & RESIDENTIAL (KINGS COUNTY) | $59.05 | $48.08 | $107.13 |
| CARPENTER: HEAVY & HIGHWAY (KINGS COUNTY) | $61.59 | $55.84 | $117.43 |
| DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 | $116.43 |
| DIVER TENDER | $55.00 | $55.84 | $110.84 |
| DIVER | $75.46 | $55.84 | $131.30 |
| CARPENTERS: (TIMBERMEN) | $55.59 | $55.41 | $111.00 |
| CARPENTERS: (SOFT FLOOR LAYERS) | $59.05 | $48.08 | $107.13 |
| ELECTRICIAN (JOBBING, AND MAINTENANCE AND REPAIR WORK) PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $32.00 | $27.16 | $59.16 |
| ELECTRICIAN PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $62.00 | $65.81 | $127.81 |
| LINE CONSTRUCTION: LINEMAN AND CABLE SPLICER (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $70.57 | $39.19 | $109.76 |
| LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $56.46 | $34.63 | $91.09 |
| LINE CONSTRUCTION: GROUNDMAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $42.34 | $30.05 | $72.39 |
| ELEVATOR MECHANIC: MODERNIZATION AND REPAIR ( | $59.09 | $45.56 | $104.65 |
| ELEVATOR MECHANIC: ELEVATOR CONSTRUCTOR ( | $75.14 | $47.45 | $122.59 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: THREE DRUM DERRICKS | $100.14 | $36.95 | $137.09 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: CRANES, HYDRAULIC CRANES, 2 DRUM DERRICKS, FORKLIFTS, BOOM TRUCKS. PREMIUM FOR CRANES ON STEEL ERECTION: 100' TO 149' BOOM - ADD $1.75. 150' TO 246' BOOM - ADD $2.00. 250' TO 349' BOOM- ADD $2.25. 350' TO 450; BOOM- ADD $2.75. TOWER CRANDE- ADD $2.00 | $96.26 | $36.95 | $133.21 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: COMPRESSORS, WELDING MACHINES | $56.34 | $36.95 | $93.29 |
| POWER EQUIPMENT OPERATOR: UTILITY: UTILITY COMPRESSORS | $57.14 | $38.95 | $96.09 |
| POWER EQUIPMENT OPERATOR: UTILITY: OFF SHIFT COMPRESSORS | $71.98 | $38.95 | $110.93 |
| POWER EQUIPMENT OPERATOR: UTILITY: HORIZONTAL BORING RIG | $86.61 | $38.95 | $125.56 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT SPREADER | $91.04 | $38.95 | $129.99 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT ROLLER | $88.72 | $38.95 | $127.67 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT PLANTS | $75.01 | $38.95 | $113.96 |
| POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING & RESIDENTIAL) COMPRESSORS, WELDING MACHINES (CUTTING CONCRETE WORK), PAINT SPRAYING, SAND BLASTING, PUMPS (WITH THE EXCLUSION OF CONCRETE PUMPS), HOUSE CAR (SETTLEMENT BASIS ONLY), ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILIARY EQUIPMENT, AIR, HYDRAULIC, ETC., BOILERS DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $54.12 | $38.95 | $93.07 |
| POWER EQUIPMENT OPERATOR GROUP 4 (BUILDING & RESIDENTIAL) FORK LIFT, HOUSE CARS, PLASTER (PLATFORM MACHINE), PLASTER BUCKET, CONCRETE PUMP AND ALL OTHER EQUIPMENT USED FOR HOISTING MATERIAL | $72.46 | $38.95 | $111.41 |
| POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING & RESIDENTIAL) 4 POLE HOIST, SINGLE DRUM HOISTS | $79.70 | $38.95 | $118.65 |
| POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING & RESIDENTIAL) STONE DERRICK, CRANES, HYDRAULIC CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 | $97.79 | $38.95 | $136.74 |
| POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING & RESIDENTIAL) DOUBLE DRUM | $92.32 | $38.95 | $131.27 |
| POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) SHOVELS, CRANES (DRAGLINES), BACKHOES, PAVERS, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 | $44.45 | $38.00 | $82.45 |
| POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) GRADALLS AND CONCRETE PUMPS OR SIMILARLY EQUIPMENT MANNED BY TWO-MEN PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 | $64.82 | $38.00 | $102.82 |
| POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY AND HIGHWAY) MINOR EQUIPMENT SUCH AS TRACTORS, POST HOLE DIGGERS AND DRIVERS, DITCH WITCH (WALK BEHIND), ROAD FINISHING MACHINES, ROLLERS (FIVE (5) TONS AND UNDER), TUGGER HOISTS, DUAL PURPOSE TRUCKS, FORK LIFTS AND DEMPSEY DUMPSTERS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $68.62 | $38.00 | $106.62 |
| POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY AND HIGHWAY) CHERRYPICKERS 20 TONS AND OVER AND LOADERS (RUBBER-TIRED AND/OR TRACTOR TYPE WITH A MANFUFACTURER'S RATED CAPACITY OF SIX CUBIC YARDS AND OVER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 | $74.65 | $38.00 | $112.65 |
| POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY AND HIGHWAY) RUBBER TIRE BACKHOES UP TO AND INCLUDING 37,000 LBS, BASIN MACHINES, GROOVER, MECHANICAL SWEEPERS, BOBCAT, BOOM TRUCK, BARRIER TRANSPORT (BARRIER MOVER) AND MACHINES OF A SIMILAR NATURE, BOAT CAPTAINS, BOAT OPERATORS, OPERATION OF CHURN DRILLS AND MACHINES OF A SIMILAR NATURE, STETCO SILENT HOIST AND MACHINES OF A SIMILAR NATURE, VAC-ALLS, MEYERS MACHINES, JOHN BEAM AND MACHINES OF A SIMILAR NATURE, ROSS CARRIERS AND TRAVEL LIFTS AND MACHINES OF A SIMILAR NATURE, BULLDOZERS, SCRAPERS, AND TURN-A PULLS, TUGGER HOIST (USED EXCLUSIVELY FOR HANDLING EXCAVATED MATERIAL), TRACTORS WITH ATTACHMENTS, HYSTER AND ROUSTABOUT CRANES, CHERRYPICKERS, AUSTIN WESTERN, GROVE AND MACHINES OF A SIMILAR NATURE, SCOOPMOBILES, MONORAILS, CONVEYORS, TRENCHERS, LOADERS- RUBBER-TIRED AND TRACTOR, BARBER GREENE, EIMCO LOADERS AND EIMCO BACKHOES, MIGHTY MIDGET AND SIMILAR BREAKERS AND TAMPERS, CURB AND GUTTER PAVERS AND MOTOR PATROL, MOTOR GRADERS AND ALL MACHINES OF A SIMILAR NATURE, LOCOMOTIVES TEN (10) TONS OR UNDER, MINI-MAX, BREAK-TECH AND MACHINES OF A SIMILAR NATURE, MILLING MACHINES, ROBOTIC AND DEMOLITION MACHINES AND MACHINES OF A SIMILAR NATURE INCLUDING BOBCAT, PILE RIG RUBBER-TIRED EXCAVATOR (37,000 LBS. AND UNDER), 2 MAN AUGER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 | $72.40 | $38.00 | $110.40 |
| POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING) GRADALLS: CONCRETE PUMPS, POWER HOUSES - ALL EQUIPMENT IN SAME IS MANNED BY TWO (2) MEN ONLY, DRIVING TRUCK CRANES | $57.42 | $32.95 | $90.37 |
| POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING) OILERS ON CRAWLER CRANES, BACKHOES, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $63.98 | $32.95 | $96.93 |
| POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING) OILER | $65.94 | $32.95 | $98.89 |
| IRONWORKER: STRUCTURAL (BRONX, NEW YORK, RICHMOND) | $58.95 | $92.02 | $150.97 |
| IRONWORKER: METALLIC LATHERS AND REINFORCING IRONWORKERS | $57.00 | $32.96 | $89.96 |
| IRONWORKER: STONE DERRICKMAN | $60.40 | $60.14 | $120.54 |
| IRONWORKERS: STRUCTURAL (KINGS, QUEENS) | $58.95 | $92.02 | $150.97 |
| IRONWORKER: ORNAMENTAL | $48.15 | $67.62 | $115.77 |
| LABORER (CEMENT AND CONCRETE WORKERS) | $49.28 | $27.05 | $76.33 |
| LABOERE, BUILDING CONSTRUCTION: MASON TENDER/GENERAL LABORER | $44.70 | $29.55 | $74.25 |
| LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS (INTERIOR) (Tier A- RESPONSIBLE FOR THE REMOVAL OF ALL INTERIOR PETITIONS AND STRUCTURAL PETITIONS THAT CN CONSIST OF SHEET ROCK, BLOCK OR MASONRY. ALSO, ALL STRUCTURAL SLAB OPENINGS AND EXTERIOR WALLS WHERE THE BUILDING IS NOT BEING COMPLETELY DEMOLITIONED.) | $40.22 | $25.17 | $65.39 |
| LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS (INTERIOR) (Tier B- RESPONSIBLE FOR SHOVELING OF DEBRIS INTO CONTAINER, PUSHING CONTAINERS FROM THE INSIDE TO THE OUTSIDE OF THE BIULDING) | $29.29 | $20.29 | $49.58 |
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION UTILITY LABORER (PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY) | $44.35 | $52.08 | $96.43 |
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION LABORER: (ASBESTOS, LEAD, HAZARDOUS WASTE REMOVAL (INCLUDING SOIL)/CEMENT/CONCRETE (PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY) | $44.50 | $52.08 | $96.58 |
| LABORERS-ASPHALT CONSTRUCTION: SMALL EQUIPMENT OPERATOR (ASPHALT) | $46.33 | $54.05 | $100.38 |
| LABORERS-ASPHALT CONSTRUCTION: SHOVELER (PRODUCTION PAVING ONLY) | $46.33 | $54.05 | $100.38 |
| LABORERS-ASPHALT CONSTRUCTION: SCREEDPERSON | $50.80 | $54.05 | $104.85 |
| LABORERS-ASPHALT CONSTRUCTION: RAKER | $50.20 | $54.05 | $104.25 |
| LABORERS-ASPHALT CONSTRUCTION: MICRO PAVER | $50.80 | $54.05 | $104.85 |
| PAINTER (SPRAY, SCAFFOLD AND SANDBLASTING) | $47.75 | $44.11 | $91.86 |
| PAINTER (PAINTERS, DRYWALL FINISHERS, LEAD ABATEMENT WORKER) | $44.75 | $44.11 | $88.86 |
| GLAZIER | $49.20 | $57.20 | $106.40 |
| PAINTERS (STRUCTURAL STEEL AND BRIDGE) | $56.25 | $55.14 | $111.39 |
| PAINTERS (DRYWALL TAPERS/POINTERS) | $48.47 | $35.91 | $84.38 |
| PLASTERER | $48.51 | $32.78 | $81.29 |
| PLASTERER (KINGS AND QUEENS COUNTIES) | $48.51 | $32.78 | $81.29 |
| CEMENT MASON/CONCRETE FINISHER | $59.87 | $41.81 | $101.68 |
| PLUMBER: MECHANICAL EQUIPMENT AND SERVICE (ANY REPAIR AND/OR REPLACEMENT OF THE PRESENT PLUMBING SYSTEM THAT DOES NOT CHANGE THE EXISTING ROUGHING) | $48.90 | $22.26 | $71.16 |
| PLUMBER | $73.00 | $32.81 | $105.81 |
| PLUMBER: SPRINKLER FITTERS, STEAMFITTERS | $70.36 | $54.24 | $124.60 |
| PLUMBER: SERVICE FITTERS (SERVICE FITTER WORK SHALL CONSIST OF ALL REPAIR, SERVICE AND MAINTENANCE WORK ON DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS ETC., INCLUDING BUT NOT EXCLLUSIVLY FOR CHARGING, EVACUATION, LEAK TESTING AND ASSEMBLING FOR ALL MACHINES FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND HEATING APPARATUS. ALSO, WORK SHALL INCLUDE ADJUSTING, INCLUDING CAPACITY ADJUSTMENTS, CHECKING AND REPAIRING OR REPLACEMENT OF ALL CONTROLS AND START UP OF ALL MACHINES AND REPAIRING ALL DEFECTS THAT MAY DEVELOP ON ANY SYSTEM FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION AND ALL AIR CONDITINIONG, AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS REGARDLESS OF SIZE OR TYPE.) | $47.85 | $23.96 | $71.81 |
| ROOFER | $50.25 | $32.62 | $82.87 |
| SHEET METAL WORKER (RESIDENTIAL CONSTRUCTION) | $35.79 | $25.37 | $61.16 |
| SHEET METAL WORKER (BUILDING CONSTRUCTION) | $53.60 | $60.74 | $114.34 |
| TRUCK DRIVER: HIGH RISE ( | $65.43 | $53.15 | $118.58 |
| TRUCK DRIVER: ASPHALT ( | $46.12 | $59.65 | $105.77 |
| TRUCK DRIVER EUCLIDS & TURNAPULLS ( | $49.38 | $57.65 | $107.03 |