Queens County, New York: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Heavy NY20260001 rev 2
DREDGING 7 classifications · $45.01 to $63.82 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $30.86 | $14.15 | $45.01 |
| DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $37.15 | $14.57 | $51.72 |
| DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $38.38 | $14.66 | $53.04 |
| DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $39.46 | $14.73 | $54.19 |
| DREDGING: CLASS B1: DERRICK OPERATOR (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $41.93 | $14.90 | $56.83 |
| DREDGING: CLASS A2: CRANE OPERATOR (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $43.20 | $14.99 | $58.19 |
| DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | $48.48 | $15.34 | $63.82 |
Residential NY20260003 rev 4
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS (DRYWALL TAPERS/POINTERS) | $48.47 | $35.91 | $84.38 |
| PLASTERER | $48.51 | $32.78 | $81.29 |
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | $61.45 |
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 |
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | $61.45 |
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 |
| BOILERMAKER | $68.88 | $49.83 | $118.71 |
| MASON - STONE | $69.91 | $44.02 | $113.93 |
| BRICKLAYER | $67.39 | $35.90 | $103.29 |
| MASON - STONE | $69.91 | $44.02 | $113.93 |
| BRICKLAYER | $67.39 | $35.90 | $103.29 |
| POINTER, CLEANER AND CAULKER | $63.69 | $32.42 | $96.11 |
| MARBLE MASON | $63.92 | $40.20 | $104.12 |
| TERRAZZO WORKER/SETTER | $64.62 | $37.63 | $102.25 |
| TERRAZZO FINISHER | $49.59 | $34.25 | $83.84 |
| TILE FINISHER | $49.59 | $34.25 | $83.84 |
| MARBLE FINISHER | $49.99 | $37.54 | $87.53 |
| BRICKLAYER (MARBLE POLISHERS) | $52.32 | $36.25 | $88.57 |
| TILE LAYER | $64.40 | $37.13 | $101.53 |
| CARPENTER, BUILDING & RESIDENTIAL (RICHMOND COUNTY) | $59.05 | $48.08 | $107.13 |
| CARPENTER: HEAVY & HIGHWAY (RICHMOND COUNTY) | $61.59 | $55.84 | $117.43 |
| CARPENTER, BUILDING & RESIDENTIAL (QUEENS COUNTY) | $59.05 | $48.08 | $107.13 |
| CARPENTER: HEAVY & HIGHWAY (QUEENS COUNTY) | $61.59 | $55.84 | $117.43 |
| CARPENTER, BUILDING & RESIDENTIAL (BRONX AND NEW YORK COUNTIES) | $59.05 | $48.08 | $107.13 |
| CARPENTER: HEAVY & HIGHWAY (BRONX AND NEW YORK COUNTIES) | $61.59 | $55.84 | $117.43 |
| MILLWRIGHT | $60.83 | $58.03 | $118.86 |
| CARPENTER, BUILDING & RESIDENTIAL (KINGS COUNTY) | $59.05 | $48.08 | $107.13 |
| CARPENTER: HEAVY & HIGHWAY (KINGS COUNTY) | $61.59 | $55.84 | $117.43 |
| DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 | $116.43 |
| DIVER TENDER | $55.00 | $55.84 | $110.84 |
| DIVER | $75.46 | $55.84 | $131.30 |
| CARPENTERS: (TIMBERMEN) | $55.59 | $55.41 | $111.00 |
| CARPENTERS: (SOFT FLOOR LAYERS) | $59.05 | $48.08 | $107.13 |
| ELECTRICIAN (JOBBING, AND MAINTENANCE AND REPAIR WORK) PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $32.00 | $27.16 | $59.16 |
| ELECTRICIAN PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $62.00 | $65.81 | $127.81 |
| LINE CONSTRUCTION: LINEMAN AND CABLE SPLICER (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $70.57 | $39.19 | $109.76 |
| LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $56.46 | $34.63 | $91.09 |
| LINE CONSTRUCTION: GROUNDMAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $42.34 | $30.05 | $72.39 |
| ELEVATOR MECHANIC: MODERNIZATION AND REPAIR ( | $59.09 | $45.56 | $104.65 |
| ELEVATOR MECHANIC: ELEVATOR CONSTRUCTOR ( | $75.14 | $47.45 | $122.59 |
| POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING & RESIDENTIAL) COMPRESSORS, WELDING MACHINES (CUTTING CONCRETE WORK), PAINT SPRAYING, SAND BLASTING, PUMPS (WITH THE EXCLUSION OF CONCRETE PUMPS), HOUSE CAR (SETTLEMENT BASIS ONLY), ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILIARY EQUIPMENT, AIR, HYDRAULIC, ETC., BOILERS DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $54.12 | $38.95 | $93.07 |
| POWER EQUIPMENT OPERATOR GROUP 4 (BUILDING & RESIDENTIAL) FORK LIFT, HOUSE CARS, PLASTER (PLATFORM MACHINE), PLASTER BUCKET, CONCRETE PUMP AND ALL OTHER EQUIPMENT USED FOR HOISTING MATERIAL | $72.46 | $38.95 | $111.41 |
| POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING & RESIDENTIAL) 4 POLE HOIST, SINGLE DRUM HOISTS | $79.70 | $38.95 | $118.65 |
| POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING & RESIDENTIAL) STONE DERRICK, CRANES, HYDRAULIC CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 | $97.79 | $38.95 | $136.74 |
| POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING & RESIDENTIAL) DOUBLE DRUM | $92.32 | $38.95 | $131.27 |
| POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) SHOVELS, CRANES (DRAGLINES), BACKHOES, PAVERS, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 | $44.45 | $38.00 | $82.45 |
| POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) GRADALLS AND CONCRETE PUMPS OR SIMILARLY EQUIPMENT MANNED BY TWO-MEN PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 | $64.82 | $38.00 | $102.82 |
| POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY AND HIGHWAY) MINOR EQUIPMENT SUCH AS TRACTORS, POST HOLE DIGGERS AND DRIVERS, DITCH WITCH (WALK BEHIND), ROAD FINISHING MACHINES, ROLLERS (FIVE (5) TONS AND UNDER), TUGGER HOISTS, DUAL PURPOSE TRUCKS, FORK LIFTS AND DEMPSEY DUMPSTERS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $68.62 | $38.00 | $106.62 |
| POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY AND HIGHWAY) CHERRYPICKERS 20 TONS AND OVER AND LOADERS (RUBBER-TIRED AND/OR TRACTOR TYPE WITH A MANFUFACTURER'S RATED CAPACITY OF SIX CUBIC YARDS AND OVER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 | $74.65 | $38.00 | $112.65 |
| LABORERS-ASPHALT CONSTRUCTION: MICRO PAVER | $50.80 | $54.05 | $104.85 |
| PAINTER (SPRAY, SCAFFOLD AND SANDBLASTING) | $47.75 | $44.11 | $91.86 |
| PAINTER (PAINTERS, DRYWALL FINISHERS, LEAD ABATEMENT WORKER) | $44.75 | $44.11 | $88.86 |
| GLAZIER | $49.20 | $57.20 | $106.40 |
| PAINTERS (STRUCTURAL STEEL AND BRIDGE) | $56.25 | $55.14 | $111.39 |
| POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY AND HIGHWAY) RUBBER TIRE BACKHOES UP TO AND INCLUDING 37,000 LBS, BASIN MACHINES, GROOVER, MECHANICAL SWEEPERS, BOBCAT, BOOM TRUCK, BARRIER TRANSPORT (BARRIER MOVER) AND MACHINES OF A SIMILAR NATURE, BOAT CAPTAINS, BOAT OPERATORS, OPERATION OF CHURN DRILLS AND MACHINES OF A SIMILAR NATURE, STETCO SILENT HOIST AND MACHINES OF A SIMILAR NATURE, VAC-ALLS, MEYERS MACHINES, JOHN BEAM AND MACHINES OF A SIMILAR NATURE, ROSS CARRIERS AND TRAVEL LIFTS AND MACHINES OF A SIMILAR NATURE, BULLDOZERS, SCRAPERS, AND TURN-A PULLS, TUGGER HOIST (USED EXCLUSIVELY FOR HANDLING EXCAVATED MATERIAL), TRACTORS WITH ATTACHMENTS, HYSTER AND ROUSTABOUT CRANES, CHERRYPICKERS, AUSTIN WESTERN, GROVE AND MACHINES OF A SIMILAR NATURE, SCOOPMOBILES, MONORAILS, CONVEYORS, TRENCHERS, LOADERS- RUBBER-TIRED AND TRACTOR, BARBER GREENE, EIMCO LOADERS AND EIMCO BACKHOES, MIGHTY MIDGET AND SIMILAR BREAKERS AND TAMPERS, CURB AND GUTTER PAVERS AND MOTOR PATROL, MOTOR GRADERS AND ALL MACHINES OF A SIMILAR NATURE, LOCOMOTIVES TEN (10) TONS OR UNDER, MINI-MAX, BREAK-TECH AND MACHINES OF A SIMILAR NATURE, MILLING MACHINES, ROBOTIC AND DEMOLITION MACHINES AND MACHINES OF A SIMILAR NATURE INCLUDING BOBCAT, PILE RIG RUBBER-TIRED EXCAVATOR (37,000 LBS. AND UNDER), 2 MAN AUGER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 | $72.40 | $38.00 | $110.40 |
| POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING) GRADALLS: CONCRETE PUMPS, POWER HOUSES - ALL EQUIPMENT IN SAME IS MANNED BY TWO (2) MEN ONLY, DRIVING TRUCK CRANES | $57.42 | $32.95 | $90.37 |
| POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING) OILERS ON CRAWLER CRANES, BACKHOES, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $63.98 | $32.95 | $96.93 |
| POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING) OILER | $65.94 | $32.95 | $98.89 |
| IRONWORKER: STRUCTURAL (BRONX, NEW YORK, RICHMOND) | $58.95 | $92.02 | $150.97 |
| IRONWORKER: METALLIC LATHERS AND REINFORCING IRONWORKERS | $57.00 | $32.96 | $89.96 |
| IRONWORKER: STONE DERRICKMAN | $60.40 | $60.14 | $120.54 |
| IRONWORKERS: STRUCTURAL (KINGS, QUEENS) | $58.95 | $92.02 | $150.97 |
| IRONWORKER: ORNAMENTAL | $48.15 | $67.62 | $115.77 |
| LABORER (CEMENT AND CONCRETE WORKERS) | $49.28 | $27.05 | $76.33 |
| LABOERE, BUILDING CONSTRUCTION: MASON TENDER/GENERAL LABORER | $44.70 | $29.55 | $74.25 |
| LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS (INTERIOR) (Tier A- RESPONSIBLE FOR THE REMOVAL OF ALL INTERIOR PETITIONS AND STRUCTURAL PETITIONS THAT CN CONSIST OF SHEET ROCK, BLOCK OR MASONRY. ALSO, ALL STRUCTURAL SLAB OPENINGS AND EXTERIOR WALLS WHERE THE BUILDING IS NOT BEING COMPLETELY DEMOLITIONED.) | $40.22 | $25.17 | $65.39 |
| LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS (INTERIOR) (Tier B- RESPONSIBLE FOR SHOVELING OF DEBRIS INTO CONTAINER, PUSHING CONTAINERS FROM THE INSIDE TO THE OUTSIDE OF THE BIULDING) | $29.29 | $20.29 | $49.58 |
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION UTILITY LABORER (PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY) | $44.35 | $52.08 | $96.43 |
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION LABORER: (ASBESTOS, LEAD, HAZARDOUS WASTE REMOVAL (INCLUDING SOIL)/CEMENT/CONCRETE (PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY) | $44.50 | $52.08 | $96.58 |
| LABORERS-ASPHALT CONSTRUCTION: SMALL EQUIPMENT OPERATOR (ASPHALT) | $46.33 | $54.05 | $100.38 |
| LABORERS-ASPHALT CONSTRUCTION: SHOVELER (PRODUCTION PAVING ONLY) | $46.33 | $54.05 | $100.38 |
| LABORERS-ASPHALT CONSTRUCTION: SCREEDPERSON | $50.80 | $54.05 | $104.85 |
| LABORERS-ASPHALT CONSTRUCTION: RAKER | $50.20 | $54.05 | $104.25 |
| PLASTERER (KINGS AND QUEENS COUNTIES) | $48.51 | $32.78 | $81.29 |
| CEMENT MASON/CONCRETE FINISHER | $59.87 | $41.81 | $101.68 |
| PLUMBER: MECHANICAL EQUIPMENT AND SERVICE (ANY REPAIR AND/OR REPLACEMENT OF THE PRESENT PLUMBING SYSTEM THAT DOES NOT CHANGE THE EXISTING ROUGHING) | $48.90 | $22.26 | $71.16 |
| PLUMBER | $73.00 | $32.81 | $105.81 |
| PLUMBER: SPRINKLER FITTERS, STEAMFITTERS | $70.36 | $54.24 | $124.60 |
| PLUMBER: SERVICE FITTERS (SERVICE FITTER WORK SHALL CONSIST OF ALL REPAIR, SERVICE AND MAINTENANCE WORK ON DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS ETC., INCLUDING BUT NOT EXCLLUSIVLY FOR CHARGING, EVACUATION, LEAK TESTING AND ASSEMBLING FOR ALL MACHINES FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND HEATING APPARATUS. ALSO, WORK SHALL INCLUDE ADJUSTING, INCLUDING CAPACITY ADJUSTMENTS, CHECKING AND REPAIRING OR REPLACEMENT OF ALL CONTROLS AND START UP OF ALL MACHINES AND REPAIRING ALL DEFECTS THAT MAY DEVELOP ON ANY SYSTEM FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION AND ALL AIR CONDITINIONG, AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS REGARDLESS OF SIZE OR TYPE.) | $47.85 | $23.96 | $71.81 |
| ROOFER | $50.25 | $32.62 | $82.87 |
| SHEET METAL WORKER (RESIDENTIAL CONSTRUCTION) | $35.79 | $25.37 | $61.16 |
| SHEET METAL WORKER (BUILDING CONSTRUCTION) | $53.60 | $60.74 | $114.34 |
| TRUCK DRIVER: HIGH RISE ( | $65.43 | $53.15 | $118.58 |
| TRUCK DRIVER: ASPHALT ( | $46.12 | $59.65 | $105.77 |
| TRUCK DRIVER EUCLIDS & TURNAPULLS ( | $49.38 | $57.65 | $107.03 |
POWER EQUIPMENT OPERATOR, STEEL ERECTION 6 classifications · $93.29 to $137.09 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: THREE DRUM DERRICKS | $100.14 | $36.95 | $137.09 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: CRANES, HYDRAULIC CRANES, 2 DRUM DERRICKS, FORKLIFTS, BOOM TRUCKS. PREMIUM FOR CRANES ON STEEL ERECTION: 100' TO 149' BOOM - ADD $1.75. 150' TO 246' BOOM - ADD $2.00. 250' TO 349' BOOM- ADD $2.25. 350' TO 450; BOOM- ADD $2.75. TOWER CRANDE- ADD $2.00. | $96.26 | $36.95 | $133.21 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: COMPRESSORS, WELDING MACHINES | $56.34 | $36.95 | $93.29 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: THREE DRUM DERRICKS | $100.14 | $36.95 | $137.09 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: CRANES, HYDRAULIC CRANES, 2 DRUM DERRICKS, FORKLIFTS, BOOM TRUCKS. PREMIUM FOR CRANES ON STEEL ERECTION: 100' TO 149' BOOM - ADD $1.75. 150' TO 246' BOOM - ADD $2.00. 250' TO 349' BOOM- ADD $2.25. 350' TO 450; BOOM- ADD $2.75. TOWER CRANDE- ADD $2.00. | $96.26 | $36.95 | $133.21 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: COMPRESSORS, WELDING MACHINES | $56.34 | $36.95 | $93.29 |
POWER EQUIPMENT OPERATOR 6 classifications · $96.09 to $125.56 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: UTILITY: UTILITY COMPRESSORS | $57.14 | $38.95 | $96.09 |
| POWER EQUIPMENT OPERATOR: UTILITY: OFF SHIFT COMPRESSORS | $71.98 | $38.95 | $110.93 |
| POWER EQUIPMENT OPERATOR: UTILITY: HORIZONTAL BORING RIG | $86.61 | $38.95 | $125.56 |
| POWER EQUIPMENT OPERATOR: UTILITY: UTILITY COMPRESSORS | $57.14 | $38.95 | $96.09 |
| POWER EQUIPMENT OPERATOR: UTILITY: OFF SHIFT COMPRESSORS | $71.98 | $38.95 | $110.93 |
| POWER EQUIPMENT OPERATOR: UTILITY: HORIZONTAL BORING RIG | $86.61 | $38.95 | $125.56 |
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY 6 classifications · $113.96 to $129.99 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT SPREADER | $91.04 | $38.95 | $129.99 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT ROLLER | $88.72 | $38.95 | $127.67 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT PLANTS | $75.01 | $38.95 | $113.96 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT SPREADER | $91.04 | $38.95 | $129.99 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT ROLLER | $88.72 | $38.95 | $127.67 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT PLANTS | $75.01 | $38.95 | $113.96 |
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY 30 classifications · $96.47 to $156.55 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS, (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC. | $57.52 | $38.95 | $96.47 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL | $61.87 | $38.95 | $100.82 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 13 VIBRATORY | $81.97 | $38.95 | $120.92 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 | $81.38 | $38.95 | $120.33 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 11 ELEVATORS | $79.62 | $38.95 | $118.57 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 10 CONCRETE MIXERS | $85.21 | $38.95 | $124.16 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE (OTHER THAN ABOVE) | $88.72 | $38.95 | $127.67 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS | $91.04 | $38.95 | $129.99 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 | $93.74 | $38.95 | $132.69 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 6 ALL DRILLS, AND MACHINES OF A SIMILAR NATURE | $92.01 | $38.95 | $130.96 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5 PILEDRIVERS, DERRICK BOATS, TUNNEL SHOVELS | $95.83 | $38.95 | $134.78 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 | $97.75 | $38.95 | $136.70 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 | $100.18 | $38.95 | $139.13 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2 RUBBER TIRE BACKHOES OVER 37,000 LBS, TRACK BACKHOES, POWER SHOVEL, HYDRAULIC CLAM SHELLS, MOLES AND MACHINES OF A SIMILAR TYPE | $97.06 | $38.95 | $136.01 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES (CRAWLER OR TRUCK): ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 | $117.60 | $38.95 | $156.55 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS, (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC. | $57.52 | $38.95 | $96.47 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL | $61.87 | $38.95 | $100.82 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 13 VIBRATORY | $81.97 | $38.95 | $120.92 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 | $81.38 | $38.95 | $120.33 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 11 ELEVATORS | $79.62 | $38.95 | $118.57 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 10 CONCRETE MIXERS | $85.21 | $38.95 | $124.16 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE (OTHER THAN ABOVE) | $88.72 | $38.95 | $127.67 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS | $91.04 | $38.95 | $129.99 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 | $93.74 | $38.95 | $132.69 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 6 ALL DRILLS, AND MACHINES OF A SIMILAR NATURE | $92.01 | $38.95 | $130.96 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5 PILEDRIVERS, DERRICK BOATS, TUNNEL SHOVELS | $95.83 | $38.95 | $134.78 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 | $97.75 | $38.95 | $136.70 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 | $100.18 | $38.95 | $139.13 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2 RUBBER TIRE BACKHOES OVER 37,000 LBS, TRACK BACKHOES, POWER SHOVEL, HYDRAULIC CLAM SHELLS, MOLES AND MACHINES OF A SIMILAR TYPE | $97.06 | $38.95 | $136.01 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES (CRAWLER OR TRUCK): ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 | $117.60 | $38.95 | $156.55 |
LABORERS 15 classifications · $62.05 to $118.08 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: ASBESTOS (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION) | $41.15 | $20.90 | $62.05 |
| LABORERS: FREE AIR & TUNNEL (MAINTENANCE MEN, INSIDE MUCK LOCK TENDERS, PUMP MEN, ELECTRICIANS, CEMENT FINISHERS, CAULKERS, HYDRAULIC MEN, SHIELD MEN, MONORAIL OPERATORS, MOTOR MEN, CONVEYOR MEN, POWDER CARRIERS, PAN MEN, RIGGERS, CHUCK TENDERS, TRACK MEN PAINTERS, NIPPERS, BRAKEMEN, CABLE MEN, HOSE MEN, GROUT MEN, GRAVEL MEN, FORM WORKERS, CONCRETE WORKERS, TUNNEL LABORERS, MOLE NIPPER (ONE (1) MOLE SIPPER PER WORKING SHAFT PER SHIFT FOR UP TO AND INCLUDING TWO (2) MOLES) | $64.08 | $54.00 | $118.08 |
| LABORERS:, HEAVY (JACKHAMMERS, CHIPPERS, SPADERS, CONCRETE BREAKERS, ALL OTHER PNEUMATIC TOOLS, WALK BEHIND SELF-PROPELLED HYDRAULIC ASPHALT AND CONCRETE BREAKER) | $44.50 | $52.08 | $96.58 |
| LABORERS: HEAVY (POWDER CARRIERS) | $44.50 | $52.08 | $96.58 |
| LABORERS: HEAVY (HYDRAULIC TRAC DRILL) | $51.85 | $52.08 | $103.93 |
| LABORERS: HEAVY (BLASTERS) | $57.71 | $52.08 | $109.79 |
| LABORERS: HEAVY (BLASTERS (HYDRAULIC TRAC DRILL)) | $51.85 | $52.08 | $103.93 |
| LABORERS: SMALL POWER TOOLS OPERATOR (HIGHWAY CONSTRUCTION) ( | $46.33 | $54.04 | $100.37 |
| LABORERS: SMALL EQUIPMENT OPERATOR (NOT OPERATING ENGINEER) (HIGHWAY CONSTRUCTION) ( | $46.33 | $54.04 | $100.37 |
| LABORERS: SLURRY/SEALCOATER/PLAY EQUIPMENT INSTALLER (HIGHWAY CONSTRUCTION) ( | $46.33 | $54.04 | $100.37 |
| LABORERS: MAINTENANCE SAFETY SURFACE (HIGHWAY CONSTRUCTION) ( | $46.33 | $54.04 | $100.37 |
| LABORERS: LANDSCAPE PLANTING & MAINTENANCE (HIGHWAY CONSTRUCTION) ( | $46.33 | $54.04 | $100.37 |
| LABORERS: LABORERS (HIGHWAY CONSTRUCTION) ( | $46.33 | $54.04 | $100.37 |
| LABORERS: FORMSETTERS (HIGHWAY CONSTRUCTION) ( | $50.80 | $54.04 | $104.84 |
| LABORERS: FENCE INSTALLER & REPAIRER (HIGHWAY CONSTRUCTION) ( | $46.33 | $54.04 | $100.37 |
Get an email when rates change here