Grafton County, New Hampshire: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building NH20260018 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.36 | $36.63 | $80.99 |
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, CHRISTMAS DAY AND THE FRIDAY AFTER THANKSGIVING. B. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $74.17 | $38.44 | $112.61 |
| IRONWORKER, STRUCTURAL | $33.65 | $26.12 | $59.77 |
| PIPEFITTER | $45.76 | $26.19 | $71.95 |
| TRUCK DRIVER: DUMP TRUCK | $17.43 | $3.60 | $21.03 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $24.77 | $11.89 | $36.66 |
| ROOFER | $18.87 | $0.00 | $18.87 |
| PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $24.77 | $10.27 | $35.04 |
| PAINTER (BRUSH AND ROLLER) | $16.87 | $2.02 | $18.89 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.00 | $2.34 | $23.34 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $20.85 | $2.61 | $23.46 |
| LABORER: MASON TENDER - BRICK | $19.60 | $2.73 | $22.33 |
| LABORER: COMMON OR GENERAL | $17.02 | $6.99 | $24.01 |
| IRONWORKER, REINFORCING | $29.89 | $10.70 | $40.59 |
| ELECTRICIAN | $25.29 | $3.91 | $29.20 |
| CEMENT MASON/CONCRETE FINISHER | $23.71 | $9.71 | $33.42 |
| CARPENTER, INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $24.86 | $12.82 | $37.68 |
| BRICKLAYER | $30.45 | $3.64 | $34.09 |
Heavy NH20260008 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $47.58 | $29.90 | $77.48 |
| TRUCK DRIVER: DUMP TRUCK | $22.00 | $6.31 | $28.31 |
| TRAFFIC CONTROL: FLAGGER | $18.00 | $6.90 | $24.90 |
| OPERATOR: LOADER | $21.50 | $0.00 | $21.50 |
| OPERATOR: BULLDOZER | $27.10 | $7.06 | $34.16 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.00 | $0.56 | $29.56 |
| LABORER: PIPELAYER | $24.00 | $2.67 | $26.67 |
| LABORER: COMMON OR GENERAL | $20.00 | $1.93 | $21.93 |
| CARPENTER | $22.50 | $3.32 | $25.82 |
Highway NH20260036 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $19.20 | $4.21 | $23.41 |
| TRAFFIC CONTROL: FLAGGER | $15.41 | $2.21 | $17.62 |
| PAINTER: SPRAY | $28.88 | $12.06 | $40.94 |
| LABORER: PIPELAYER | $18.89 | $3.10 | $21.99 |
| LABORER: COMMON OR GENERAL | $18.14 | $2.20 | $20.34 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $15.82 | $3.45 | $19.27 |
| IRONWORKER, REINFORCING | $21.59 | $0.90 | $22.49 |
| CEMENT MASON/CONCRETE FINISHER | $18.50 | $0.00 | $18.50 |
| CARPENTER, EXCLUDES FORM WORK | $25.67 | $2.39 | $28.06 |
| CARPENTER (FORM WORK ONLY) | $20.89 | $1.61 | $22.50 |
OPERATOR 11 classifications · $20.21 to $34.40 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: ROLLER | $20.91 | $5.25 | $26.16 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.93 | $4.96 | $27.89 |
| OPERATOR: MILLING MACHINE | $24.97 | $9.43 | $34.40 |
| OPERATOR: MECHANIC | $24.80 | $6.63 | $31.43 |
| OPERATOR: LOADER | $23.10 | $7.56 | $30.66 |
| OPERATOR: GRADER/BLADE | $27.79 | $0.53 | $28.32 |
| OPERATOR: CRANE | $27.71 | $6.16 | $33.87 |
| OPERATOR: BULLDOZER | $25.96 | $4.50 | $30.46 |
| OPERATOR: BROOM/SWEEPER | $17.69 | $2.52 | $20.21 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.64 | $0.00 | $25.64 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.17 | $4.76 | $28.93 |
Residential NH20260001 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: 2-AXLE | $9.65 | $0.00 | $9.65 |
| PLUMBER | $12.57 | $0.00 | $12.57 |
| PAINTER (INCLUDES DRYWALL FINISHING) | $8.53 | $0.43 | $8.96 |
| LABORER, GENERAL | $8.78 | $0.28 | $9.06 |
| ELECTRICIAN | $13.29 | $0.00 | $13.29 |
| CONCRETE FINISHER | $10.00 | $0.00 | $10.00 |
| CARPENTER | $10.96 | $0.33 | $11.29 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.