Cheshire County, New Hampshire: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building NH20260020 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.36 | $36.63 | $80.99 |
| ELECTRICIAN | $36.12 | $22.92 | $59.04 |
| IRONWORKER, STRUCTURAL | $33.65 | $26.12 | $59.77 |
| LABORER: COMMON OR GENERAL | $25.40 | $21.43 | $46.83 |
| PIPEFITTER | $45.76 | $26.19 | $71.95 |
| TRUCK DRIVER: DUMP TRUCK | $17.43 | $3.60 | $21.03 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $26.56 | $24.03 | $50.59 |
| ROOFER | $18.87 | $0.00 | $18.87 |
| PLUMBER | $25.77 | $9.23 | $35.00 |
| PAINTER (BRUSH AND ROLLER) | $20.62 | $0.00 | $20.62 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.52 | $3.17 | $24.69 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $20.85 | $2.61 | $23.46 |
| LABORER: MASON TENDER - BRICK | $19.60 | $2.73 | $22.33 |
| IRONWORKER, REINFORCING | $29.89 | $10.70 | $40.59 |
| CEMENT MASON/CONCRETE FINISHER | $23.55 | $7.14 | $30.69 |
| CARPENTER, INCLUDES DRYWALL HANGING | $21.46 | $4.22 | $25.68 |
Heavy NH20260006 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $47.58 | $29.90 | $77.48 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $34.01 | $22.37 | $56.38 |
| TRUCK DRIVER: DUMP TRUCK | $22.00 | $6.77 | $28.77 |
| TRAFFIC CONTROL: FLAGGER | $18.00 | $6.90 | $24.90 |
| OPERATOR: LOADER | $26.00 | $3.23 | $29.23 |
| OPERATOR: BULLDOZER | $27.10 | $7.06 | $34.16 |
| LABORER: PIPELAYER | $27.25 | $6.44 | $33.69 |
| LABORER: COMMON OR GENERAL | $18.59 | $6.05 | $24.64 |
| CARPENTER | $22.50 | $3.32 | $25.82 |
Highway NH20260034 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $19.99 | $2.87 | $22.86 |
| TRAFFIC CONTROL: FLAGGER | $14.65 | $1.37 | $16.02 |
| PAINTER: SPRAY | $28.88 | $12.06 | $40.94 |
| LABORER: PIPELAYER | $20.36 | $0.00 | $20.36 |
| LABORER: COMMON OR GENERAL | $18.04 | $3.42 | $21.46 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $18.57 | $2.68 | $21.25 |
| IRONWORKER, REINFORCING | $22.35 | $2.03 | $24.38 |
| INSTALLER - GUARDRAIL | $20.50 | $2.69 | $23.19 |
| CEMENT MASON/CONCRETE FINISHER | $18.50 | $0.00 | $18.50 |
| CARPENTER | $25.75 | $2.28 | $28.03 |
OPERATOR 11 classifications · $21.50 to $34.83 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: ROLLER | $22.67 | $4.50 | $27.17 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.50 | $6.70 | $32.20 |
| OPERATOR: MILLING MACHINE | $28.42 | $4.14 | $32.56 |
| OPERATOR: MECHANIC | $24.73 | $6.96 | $31.69 |
| OPERATOR: LOADER | $23.38 | $4.62 | $28.00 |
| OPERATOR: GRADER/BLADE | $28.55 | $0.53 | $29.08 |
| OPERATOR: CRANE | $27.81 | $7.02 | $34.83 |
| OPERATOR: BULLDOZER | $29.10 | $4.94 | $34.04 |
| OPERATOR: BROOM/SWEEPER | $20.29 | $2.52 | $22.81 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.84 | $0.66 | $21.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.22 | $6.08 | $30.30 |
Residential NH20260001 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: 2-AXLE | $9.65 | $0.00 | $9.65 |
| PLUMBER | $12.57 | $0.00 | $12.57 |
| PAINTER (INCLUDES DRYWALL FINISHING) | $8.53 | $0.43 | $8.96 |
| LABORER, GENERAL | $8.78 | $0.28 | $9.06 |
| ELECTRICIAN | $13.29 | $0.00 | $13.29 |
| CONCRETE FINISHER | $10.00 | $0.00 | $10.00 |
| CARPENTER | $10.96 | $0.33 | $11.29 |