Dixon County, Nebraska: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building NE20260063 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $34.80 | $19.94 | $54.74 |
| CARPENTER (INCLUDING ACOUSTICAL CEIING INSTALLATION) | $33.42 | $18.66 | $52.08 |
| ELECTRICIAN | $40.68 | $19.70 | $60.38 |
| OPERATOR: FORKLIFT | $31.06 | $18.69 | $49.75 |
| OPERATOR: CRANE | $36.44 | $18.69 | $55.13 |
| IRONWORKER, STRUCTURAL | $32.14 | $19.28 | $51.42 |
| LABORER (MASON TENDER, BRICK & HOD) | $24.00 | $13.48 | $37.48 |
| PLUMBER | $43.20 | $23.25 | $66.45 |
| PIPEFITTER | $43.20 | $23.25 | $66.45 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $39.65 | $19.87 | $59.52 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $14.09 | $2.49 | $16.58 |
| ROOFER | $13.57 | $0.77 | $14.34 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.26 | $0.00 | $14.26 |
| OPERATOR: LOADER | $19.27 | $4.00 | $23.27 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.72 | $2.10 | $23.82 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.68 | $4.93 | $25.61 |
| LABORER: COMMON OR GENERAL | $14.23 | $4.43 | $18.66 |
| FORM WORKER | $18.18 | $3.65 | $21.83 |
| CEMENT MASON/CONCRETE FINISHER | $17.74 | $3.50 | $21.24 |
| CARPENTER | $21.32 | $5.97 | $27.29 |
Heavy NE20260055 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.68 | $19.70 | $60.38 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.49 | $7.40 | $28.89 |
| OPERATOR: LOADER | $18.19 | $3.72 | $21.91 |
| OPERATOR: CRANE | $24.00 | $5.56 | $29.56 |
| OPERATOR: BACKHOE/EXCAVATOR | $21.08 | $5.26 | $26.34 |
| LABORER: PIPELAYER | $16.33 | $5.60 | $21.93 |
| LABORER: COMMON OR GENERAL | $14.40 | $3.58 | $17.98 |
| FORM WORKER | $17.59 | $5.74 | $23.33 |
| CEMENT MASON/CONCRETE FINISHER | $19.38 | $6.21 | $25.59 |
Highway NE20260029 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.68 | $19.70 | $60.38 |
| TRUCK DRIVER: WATER TRUCK | $18.00 | $6.40 | $24.40 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $14.39 | $0.00 | $14.39 |
| TRUCK DRIVER: LOWBOY TRUCK | $19.26 | $6.40 | $25.66 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.71 | $6.40 | $22.11 |
| OPERATING ENGINEERS: (SKID LOADER) | $15.19 | $6.75 | $21.94 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.44 | $0.00 | $10.44 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $16.07 | $6.55 | $22.62 |
| LABORER: COMMON OR GENERAL | $14.82 | $6.35 | $21.17 |
| IRONWORKER, REINFORCING | $22.49 | $9.20 | $31.69 |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $12.37 | $0.00 | $12.37 |
| CEMENT MASON/CONCRETE FINISHER | $18.95 | $3.00 | $21.95 |
| CARPENTER, INCLUDES FORM WORK | $21.25 | $6.78 | $28.03 |
OPERATOR 17 classifications · $12.80 to $30.20 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: TRACTOR | $13.11 | $0.00 | $13.11 |
| OPERATOR: SCRAPER | $16.49 | $0.00 | $16.49 |
| OPERATOR: ROLLER | $16.96 | $6.75 | $23.71 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $19.49 | $6.75 | $26.24 |
| OPERATOR: OILER | $16.77 | $6.75 | $23.52 |
| OPERATOR: MILLING MACHINE | $12.80 | $0.00 | $12.80 |
| OPERATOR: MECHANIC | $22.44 | $6.75 | $29.19 |
| OPERATOR: LOADER | $18.63 | $6.75 | $25.38 |
| OPERATOR: HYDROHAMMER | $17.03 | $0.00 | $17.03 |
| OPERATOR: GRADER/BLADE | $18.95 | $6.75 | $25.70 |
| OPERATOR: CRANE | $23.45 | $6.75 | $30.20 |
| OPERATOR: COMPACTOR | $18.66 | $6.75 | $25.41 |
| OPERATOR: BULLDOZER | $18.20 | $6.59 | $24.79 |
| OPERATOR: BROOM/SWEEPER | $13.21 | $0.00 | $13.21 |
| OPERATOR: BACKHOE/EXCAVATOR | $20.76 | $6.56 | $27.32 |
| OPERATOR: BACKHOE LOADER COMBO | $15.94 | $0.00 | $15.94 |
| OPERATOR: ASPHALT SPREADER | $20.25 | $0.00 | $20.25 |
Residential NE20260009 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $7.25 | $0.00 | $7.25 |
| SHEET METAL WORKER | $9.20 | $0.00 | $9.20 |
| ROOFER | $11.95 | $0.00 | $11.95 |
| POWER EQUIPMENT OPERATORS: (CRANE OPERATOR) | $7.25 | $0.00 | $7.25 |
| POWER EQUIPMENT OPERATORS: (BACKHOE OPERATOR) | $7.25 | $0.00 | $7.25 |
| PIPEFITTER | $7.54 | $0.00 | $7.54 |
| PAINTER | $7.25 | $0.00 | $7.25 |
| METAL BUILDING ERECTOR | $7.25 | $0.00 | $7.25 |
| LABORERS: MASON TENDER | $7.25 | $0.00 | $7.25 |
| LABORERS: GENERAL | $7.25 | $0.00 | $7.25 |
| IRONWORKER (STRUCTURAL) | $8.88 | $0.00 | $8.88 |
| GLAZIER | $10.85 | $0.00 | $10.85 |
| FLOOR LAYER: CARPET | $9.75 | $0.00 | $9.75 |
| ELECTRICIAN | $8.43 | $0.00 | $8.43 |
| DRYWALL: (HANGER) | $9.00 | $0.00 | $9.00 |
| DRYWALL: (FINISHER) | $9.00 | $0.00 | $9.00 |
| CEMENT MASON/CONCRETE FINISHER | $7.25 | $0.00 | $7.25 |
| CARPENTER | $8.49 | $0.00 | $8.49 |
| BRICKLAYER, STONEMASON | $8.62 | $0.00 | $8.62 |
Get an email when rates change here