Jones County, North Carolina: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building NC20260018 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER | $29.75 | $18.00 | $47.75 |
| PIPEFITTER | $33.96 | $13.48 | $47.44 |
| TRUCK DRIVER: DUMP TRUCK | $15.98 | $2.93 | $18.91 |
| SHEET METAL WORKER | $19.67 | $13.27 | $32.94 |
| ROOFER | $18.26 | $4.38 | $22.64 |
| PLUMBER | $23.11 | $0.00 | $23.11 |
| PAINTER | $15.55 | $1.05 | $16.60 |
| OPERATOR: ROLLER | $15.31 | $1.46 | $16.77 |
| OPERATOR: GRADER/BLADE | $22.68 | $3.27 | $25.95 |
| OPERATOR: FORKLIFT | $16.75 | $0.00 | $16.75 |
| OPERATOR: BULLDOZER | $17.54 | $2.63 | $20.17 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.00 | $2.89 | $23.89 |
| LABORER: PIPELAYER | $16.07 | $3.22 | $19.29 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.26 | $0.00 | $15.26 |
| LABORER: MASON TENDER - BRICK | $13.17 | $0.00 | $13.17 |
| LABORER: COMMON OR GENERAL | $12.94 | $2.33 | $15.27 |
| ELECTRICIAN | $22.15 | $5.93 | $28.08 |
| CEMENT MASON/CONCRETE FINISHER | $16.72 | $0.00 | $16.72 |
| CARPENTER | $19.80 | $4.89 | $24.69 |
| BRICKLAYER | $19.13 | $0.00 | $19.13 |
Heavy NC20260019 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| WELDER (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $9.79 | $1.73 | $11.52 |
| SPILL BARGE OPERATOR (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $8.68 | $1.73 | $10.41 |
| SPIDER BARGE OPERATOR (HYDRAULIC DREDGES UNDER 20").PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $8.68 | $1.73 | $10.41 |
| SHOREMAN (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $7.82 | $1.73 | $9.55 |
| OILER & FIREMAN (HYDRAULIC DREDGES UNDER 20") | $8.11 | $1.73 | $9.84 |
| MESSMAN & JANITOR (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $7.53 | $1.73 | $9.26 |
| MESS COOK (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $7.71 | $1.73 | $9.44 |
| MATE (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $8.82 | $1.73 | $10.55 |
| LEVERMAN (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $10.03 | $1.73 | $11.76 |
| LAUNCHMAN (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $8.19 | $1.73 | $9.92 |
| ENGINEER (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $9.59 | $1.73 | $11.32 |
| DECKHAND (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $7.77 | $1.73 | $9.50 |
| COOK (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $8.11 | $1.73 | $9.84 |
| WELDER (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $9.79 | $1.73 | $11.52 |
| SPILL BARGE OPERATOR (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $8.68 | $1.73 | $10.41 |
| SPIDER BARGE OPERATOR (HYDRAULIC DREDGES UNDER 20").PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $8.68 | $1.73 | $10.41 |
| SHOREMAN (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $7.82 | $1.73 | $9.55 |
| OILER & FIREMAN (HYDRAULIC DREDGES UNDER 20") | $8.11 | $1.73 | $9.84 |
| MESSMAN & JANITOR (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $7.53 | $1.73 | $9.26 |
| MESS COOK (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $7.71 | $1.73 | $9.44 |
| MATE (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $8.82 | $1.73 | $10.55 |
| LEVERMAN (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $10.03 | $1.73 | $11.76 |
| LAUNCHMAN (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $8.19 | $1.73 | $9.92 |
| ENGINEER (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $9.59 | $1.73 | $11.32 |
| DECKHAND (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $7.77 | $1.73 | $9.50 |
| COOK (HYDRAULIC DREDGES UNDER 20"). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $8.11 | $1.73 | $9.84 |
DREDGING 14 classifications · $45.01 to $63.82 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| DREDGING :, HYDRAULIC DREDGES OVER 20":CLASS A1: DECK CAPTAIN, LEVERMAN, MECHANICAL DREDGE OPERATOR. LICENSED TUG OPERATOR OVER 1000 HP. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $48.48 | $15.34 | $63.82 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS D: SHOREMAN, DECKHAND, RODMAN, SCOWMAN, COOK, MESSMAN, OILER, JANITOR, DRILL OILER. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $30.86 | $14.15 | $45.01 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS C2: BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $37.15 | $14.57 | $51.72 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS C1: MATE, DRAG BARGE OPERATOR, WELDER, ASSISTANT FILL PLACER, STEWARD | $38.38 | $14.66 | $53.04 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS B2: CERTIFIED WELDER. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $39.46 | $14.73 | $54.19 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS A2: CRANE OPERATOR (360 SWING) . PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $43.20 | $14.99 | $58.19 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS B1: OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $41.93 | $14.90 | $56.83 |
| DREDGING :, HYDRAULIC DREDGES OVER 20":CLASS A1: DECK CAPTAIN, LEVERMAN, MECHANICAL DREDGE OPERATOR. LICENSED TUG OPERATOR OVER 1000 HP. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $48.48 | $15.34 | $63.82 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS D: SHOREMAN, DECKHAND, RODMAN, SCOWMAN, COOK, MESSMAN, OILER, JANITOR, DRILL OILER. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $30.86 | $14.15 | $45.01 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS C2: BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $37.15 | $14.57 | $51.72 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS C1: MATE, DRAG BARGE OPERATOR, WELDER, ASSISTANT FILL PLACER, STEWARD | $38.38 | $14.66 | $53.04 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS B2: CERTIFIED WELDER. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $39.46 | $14.73 | $54.19 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS A2: CRANE OPERATOR (360 SWING) . PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $43.20 | $14.99 | $58.19 |
| DREDGING :, HYDRAULIC DREDGES OVER 20": CLASS B1: OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK | $41.93 | $14.90 | $56.83 |
Highway NC20260091 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER (GVWR OF 26,001 LBS OR GREATER) | $12.04 | $0.00 | $12.04 |
| TRUCK DRIVER (GVWR OF 26,000 OR LESS) | $10.35 | $0.00 | $10.35 |
| POWER EQUIPMENT OPERATOR: MILLING MACHINE | $14.38 | $0.00 | $14.38 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $18.63 | $0.00 | $18.63 |
| POWER EQUIPMENT OPERATOR (TACK TRUCK/DISTRIBUTOR OPERATOR) | $14.56 | $0.00 | $14.56 |
| POWER EQUIPMENT OPERATOR (SLIP FORM MACHINE) | $19.29 | $0.00 | $19.29 |
| POWER EQUIPMENT OPERATOR (SCRAPER ROUGH) | $10.17 | $0.00 | $10.17 |
| POWER EQUIPMENT OPERATOR (SCRAPER FINISH) | $13.98 | $0.00 | $13.98 |
| POWER EQUIPMENT OPERATOR (ROLLER OTHER) | $10.48 | $0.00 | $10.48 |
| POWER EQUIPMENT OPERATOR (ROLLER ASPHALT FINISH) | $13.65 | $0.00 | $13.65 |
| POWER EQUIPMENT OPERATOR (ROLLER ASPHALT BREAKDOWN) | $12.13 | $0.00 | $12.13 |
| POWER EQUIPMENT OPERATOR (PAVER ASPHALT) | $15.53 | $0.00 | $15.53 |
| POWER EQUIPMENT OPERATOR (PAVEMENT MARKING EQUIPMENT) | $11.87 | $0.00 | $11.87 |
| POWER EQUIPMENT OPERATOR (OILER/GREASER) | $13.45 | $0.00 | $13.45 |
| POWER EQUIPMENT OPERATOR (OFF-ROAD HAULER/WATER TANKER) | $9.30 | $0.00 | $9.30 |
| POWER EQUIPMENT OPERATOR (MATERIAL TRANSFER VEHICLE (SHUTTLE BUGGY)) | $17.39 | $0.00 | $17.39 |
| POWER EQUIPMENT OPERATOR (LOADER GREATER THAN 2 CUBIC YARDS) | $13.58 | $0.00 | $13.58 |
| POWER EQUIPMENT OPERATOR (LOADER 2 CUBIC YARDS OR LESS) | $10.28 | $0.00 | $10.28 |
| POWER EQUIPMENT OPERATOR (GRADER/BLADE ROUGH) | $15.28 | $0.00 | $15.28 |
| POWER EQUIPMENT OPERATOR (GRADER/BLADE FINE) | $16.73 | $0.00 | $16.73 |
| POWER EQUIPMENT OPERATOR (EXCAVATOR ROUGH) | $12.99 | $0.00 | $12.99 |
| POWER EQUIPMENT OPERATOR (EXCAVATOR FINE) | $17.61 | $0.00 | $17.61 |
| POWER EQUIPMENT OPERATOR (DRILL OPERATOR STRUCTURE) | $19.12 | $0.00 | $19.12 |
| POWER EQUIPMENT OPERATOR (DRILL OPERATOR ROCK) | $15.43 | $1.61 | $17.04 |
| POWER EQUIPMENT OPERATOR (CRANE ROUGH/ALL TERRAIN) | $19.00 | $0.00 | $19.00 |
| POWER EQUIPMENT OPERATOR (CRANE OTHER) | $21.48 | $0.00 | $21.48 |
| POWER EQUIPMENT OPERATOR (CRANE BOOM TRUCKS) | $17.25 | $0.00 | $17.25 |
| POWER EQUIPMENT OPERATOR (CONCRETE GRINDER/GROOVER) | $24.66 | $0.00 | $24.66 |
| POWER EQUIPMENT OPERATOR (BULLDOZER ROUGH) | $14.09 | $0.00 | $14.09 |
| POWER EQUIPMENT OPERATOR (BULLDOZER FINE) | $18.46 | $0.00 | $18.46 |
| POWER EQUIPMENT OPERATOR (ASPHALT BROOM TRACTOR) | $13.28 | $0.00 | $13.28 |
| PAINTER (BRIDGE) | $19.62 | $0.00 | $19.62 |
| LABORER: PIPELAYER | $13.31 | $0.00 | $13.31 |
| LABORER: COMMON OR GENERAL | $10.12 | $0.00 | $10.12 |
| LABORER (TRAFFIC SIGNAL/LIGHTING INSTALLER) | $16.88 | $0.00 | $16.88 |
| LABORER (GUARDRAIL/FENCE INSTALLER) | $13.39 | $0.00 | $13.39 |
| LABORER (CEMENT MASON/CONCRETE FINISHER TENDER) | $11.35 | $0.00 | $11.35 |
| LABORER (CARPENTER TENDER) | $10.85 | $0.00 | $10.85 |
| LABORER (ASPHALT SCREED/JACKMAN) | $13.48 | $0.00 | $13.48 |
| LABORER (ASPHALT RAKER AND SPREADER) | $12.42 | $0.00 | $12.42 |
| IRONWORKER | $16.32 | $0.00 | $16.32 |
| ELECTRICIAN (TELECOMMUNICATIONS TECHNICIAN) | $14.72 | $1.67 | $16.39 |
| ELECTRICIAN (ELECTRICIAN) | $18.69 | $2.66 | $21.35 |
| CEMENT MASON/CONCRETE FINISHER | $14.26 | $0.00 | $14.26 |
| CARPENTER | $13.72 | $0.00 | $13.72 |
| BLASTER | $21.85 | $0.00 | $21.85 |
Residential NC20260116 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $14.77 | $0.00 | $14.77 |
| TRUCK DRIVER: DUMP TRUCK | $15.13 | $0.48 | $15.61 |
| SHEET METAL WORKER | $16.75 | $0.00 | $16.75 |
| ROOFER | $14.98 | $0.00 | $14.98 |
| PLUMBER | $17.66 | $0.00 | $17.66 |
| PAINTER: SPRAY | $13.02 | $0.00 | $13.02 |
| PAINTER (BRUSH AND ROLLER) | $13.17 | $0.00 | $13.17 |
| LABORER: PIPELAYER | $11.79 | $0.58 | $12.37 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.49 | $0.00 | $13.49 |
| LABORER: MASON TENDER - BRICK | $13.32 | $0.00 | $13.32 |
| LABORER: COMMON OR GENERAL | $12.20 | $0.00 | $12.20 |
| IRONWORKER, STRUCTURAL | $16.89 | $0.00 | $16.89 |
| IRONWORKER, ORNAMENTAL | $15.71 | $0.00 | $15.71 |
| HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) | $17.45 | $1.61 | $19.06 |
| ELECTRICIAN | $15.00 | $0.46 | $15.46 |
| CEMENT MASON/CONCRETE FINISHER | $16.21 | $0.00 | $16.21 |
| CARPENTER | $16.20 | $0.00 | $16.20 |
| BRICKLAYER | $18.62 | $0.00 | $18.62 |
OPERATOR 7 classifications · $13.55 to $20.06 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: ROLLER | $13.55 | $0.00 | $13.55 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $17.45 | $0.00 | $17.45 |
| OPERATOR: LOADER | $15.12 | $0.00 | $15.12 |
| OPERATOR: GRADER/BLADE | $15.83 | $0.00 | $15.83 |
| OPERATOR: BULLDOZER | $16.83 | $0.00 | $16.83 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.50 | $1.56 | $20.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.50 | $1.47 | $19.97 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.