Piscataquis County, Maine: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building ME20260011 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL AND REINFORCING | $33.65 | $26.27 | $59.92 |
| LABORER: COMMON OR GENERAL (INDUSTRIAL WORK ONLY) | $21.90 | $19.72 | $41.62 |
| PIPEFITTER | $40.00 | $24.71 | $64.71 |
| TRUCK DRIVER: DUMP TRUCK | $14.79 | $2.53 | $17.32 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $16.97 | $1.92 | $18.89 |
| PAINTER (BRUSH AND ROLLER) | $17.38 | $4.70 | $22.08 |
| OPERATOR: CRANE | $24.07 | $6.08 | $30.15 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.42 | $3.12 | $23.54 |
| LABORER: MASON TENDER - BRICK | $18.33 | $2.01 | $20.34 |
| LABORER: COMMON OR GENERAL | $14.14 | $4.20 | $18.34 |
| IRONWORKER, STRUCTURAL | $21.77 | $8.43 | $30.20 |
| ELECTRICIAN | $22.78 | $7.35 | $30.13 |
| CEMENT MASON/CONCRETE FINISHER | $16.13 | $3.82 | $19.95 |
| CARPENTER, INCLUDES FORM WORK | $17.84 | $5.73 | $23.57 |
| BRICKLAYER | $27.38 | $9.14 | $36.52 |
Heavy ME20260024 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $15.91 | $3.78 | $19.69 |
| OPERATOR: LOADER | $14.62 | $4.24 | $18.86 |
| OPERATOR: CRANE | $22.70 | $6.40 | $29.10 |
| OPERATOR: BULLDOZER | $22.91 | $6.04 | $28.95 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.48 | $4.96 | $28.44 |
| LABORER: PIPELAYER | $21.17 | $5.63 | $26.80 |
| LABORER: COMMON OR GENERAL | $13.60 | $2.12 | $15.72 |
| IRONWORKER, STRUCTURAL | $24.95 | $12.32 | $37.27 |
| ELECTRICIAN | $24.87 | $8.54 | $33.41 |
| CARPENTER, INCLUDES FORM WORK | $18.07 | $4.33 | $22.40 |
Highway ME20260041 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADER/BLADE, MILLING MACHINE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), ROLLER ASPHALT | $30.17 | $13.80 | $43.97 |
| TRUCK DRIVER: TACKTRUCK | $18.82 | $8.29 | $27.11 |
| TRUCK DRIVER: DUMP TRUCK | $14.35 | $6.33 | $20.68 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.48 | $5.37 | $22.85 |
| TRAFFIC CONTROL: FLAGGER | $9.00 | $0.00 | $9.00 |
| OPERATOR: ROLLER (EARTH) | $15.81 | $1.72 | $17.53 |
| OPERATOR: SCREED | $18.82 | $4.75 | $23.57 |
| OPERATOR: MECHANIC | $22.30 | $8.71 | $31.01 |
| OPERATOR: LOADER | $17.18 | $4.72 | $21.90 |
| OPERATOR: BULLDOZER | $16.58 | $2.89 | $19.47 |
| OPERATOR: BROOM/SWEEPER | $16.75 | $6.47 | $23.22 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.36 | $5.06 | $25.42 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $15.18 | $3.07 | $18.25 |
| LABORER: WHEELMAN | $15.40 | $3.01 | $18.41 |
| LABORER: COMMON OR GENERAL | $13.46 | $1.38 | $14.84 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $14.32 | $3.17 | $17.49 |
| IRONWORKER, REINFORCING | $16.27 | $0.00 | $16.27 |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $15.81 | $3.24 | $19.05 |
| CARPENTER, INCLUDES FORM WORK | $18.34 | $2.84 | $21.18 |
Residential ME20260003 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $7.25 | $0.00 | $7.25 |
| ROOFER | $7.25 | $0.00 | $7.25 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $7.25 | $0.00 | $7.25 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $7.25 | $0.00 | $7.25 |
| PLUMBER | $8.36 | $0.00 | $8.36 |
| PAINTER (EXCLUDING DRYWALL FINISHING) | $7.25 | $0.00 | $7.25 |
| LABORER | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN | $7.50 | $0.00 | $7.50 |
| CARPENTER (INCLUDING DRYWALL HANGING) | $9.20 | $0.00 | $9.20 |
Get an email when rates change here