Douglas County, Kansas: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building KS20260048 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 |
| BRICKLAYER | $43.57 | $23.02 | $66.59 |
| TILE FINISHER | $20.74 | $1.46 | $22.20 |
| TILE SETTER | $30.18 | $13.52 | $43.70 |
| CARPENTER | $39.59 | $22.40 | $61.99 |
| ELECTRICIAN | $44.05 | $20.25 | $64.30 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: OILER | $39.93 | $22.42 | $62.35 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | $22.42 | $67.90 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $39.00 | $34.25 | $73.25 |
| LABORER: MASON TENDER - BRICK | $25.47 | $11.38 | $36.85 |
| LABORER: COMMON OR GENERAL | $31.60 | $16.95 | $48.55 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $36.18 | $19.97 | $56.15 |
| PLUMBER | $45.90 | $19.94 | $65.84 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.90 | $19.94 | $65.84 |
| ROOFER | $38.45 | $22.29 | $60.74 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $52.18 | $27.15 | $79.33 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $52.18 | $27.15 | $79.33 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $25.50 | $10.38 | $35.88 |
| OPERATOR: ROLLER | $33.78 | $13.64 | $47.42 |
| OPERATOR: LOADER | $30.35 | $12.04 | $42.39 |
| OPERATOR: GRADER/BLADE | $31.05 | $13.26 | $44.31 |
| OPERATOR: FORKLIFT | $34.83 | $14.16 | $48.99 |
| OPERATOR: CRANE | $33.19 | $14.16 | $47.35 |
| OPERATOR: BULLDOZER | $33.12 | $13.96 | $47.08 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.69 | $7.01 | $33.70 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.86 | $1.01 | $18.87 |
| CEMENT MASON/CONCRETE FINISHER | $23.49 | $8.39 | $31.88 |
| TRUCK DRIVER: LOWBOY TRUCK | $39.89 | $15.85 | $55.74 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $39.89 | $15.85 | $55.74 |
| PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $46.39 | $20.95 | $67.34 |
Heavy KS20260005 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.64 | $18.29 | $58.93 |
| LINE CONSTRUCTION: LINEMAN | $53.68 | $26.44 | $80.12 |
| POWER EQUIPMENT OPERATOR: ROLLER | $39.57 | $21.69 | $61.26 |
| POWER EQUIPMENT OPERATOR: LOADER | $39.57 | $21.69 | $61.26 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.57 | $21.69 | $61.26 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $39.57 | $21.69 | $61.26 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.57 | $21.69 | $61.26 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $36.09 | $16.83 | $52.92 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.09 | $16.83 | $52.92 |
| IRONWORKER | $39.00 | $34.25 | $73.25 |
| LABORER: PIPELAYER | $36.24 | $15.87 | $52.11 |
| CEMENT MASON/CONCRETE FINISHER | $39.06 | $18.71 | $57.77 |
| TRUCK DRIVER: DUMP TRUCK | $28.60 | $19.49 | $48.09 |
| OPERATOR: CRANE | $32.13 | $9.58 | $41.71 |
| LABORER: COMMON OR GENERAL | $26.00 | $16.33 | $42.33 |
| CARPENTER | $28.89 | $8.87 | $37.76 |
Highway KS20260134 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $39.00 | $34.25 | $73.25 |
| TRUCK DRIVER: OFF ROAD TRUCK | $19.06 | $0.00 | $19.06 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $23.82 | $9.89 | $33.71 |
| TRUCK DRIVER: DUMP AND TANDEM | $23.23 | $11.51 | $34.74 |
| TRUCK DRIVER: WATER TRUCK | $21.96 | $10.82 | $32.78 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $16.54 | $0.00 | $16.54 |
| TRAFFIC CONTROL: SERVICE DRIVER | $17.22 | $2.44 | $19.66 |
| OPERATOR: STRIPING MACHINE | $27.27 | $12.25 | $39.52 |
| OPERATOR: ROTO MILL GROUNDMAN | $18.43 | $0.00 | $18.43 |
| OPERATOR: ROTO MILL | $22.67 | $11.87 | $34.54 |
| OPERATOR: SCREED | $16.93 | $0.00 | $16.93 |
| OPERATOR: SCRAPER | $17.67 | $0.00 | $17.67 |
| OPERATOR: ROLLER | $23.02 | $11.73 | $34.75 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.84 | $15.53 | $43.37 |
| OPERATOR: MECHANIC | $25.45 | $9.49 | $34.94 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $14.65 | $0.00 | $14.65 |
| OPERATOR: LOADER | $26.01 | $11.30 | $37.31 |
| OPERATOR: GRADER/BLADE | $25.14 | $9.03 | $34.17 |
| OPERATOR: CRANE | $23.49 | $8.55 | $32.04 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 |
| OPERATOR: BULLDOZER | $21.23 | $7.77 | $29.00 |
| OPERATOR: BROOM/SWEEPER | $19.71 | $0.00 | $19.71 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.18 | $12.13 | $36.31 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.57 | $11.57 | $36.14 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 |
| LABORER: FLAGGER | $13.20 | $0.00 | $13.20 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $29.21 | $14.63 | $43.84 |
| LABORER: COMMON OR GENERAL | $17.91 | $8.21 | $26.12 |
| IRONWORKER, REINFORCING | $29.90 | $26.11 | $56.01 |
| ELECTRICIAN | $29.93 | $14.14 | $44.07 |
| CEMENT MASON/CONCRETE FINISHER | $27.45 | $10.10 | $37.55 |
| CARPENTER, INCLUDES FORM WORK | $22.95 | $8.15 | $31.10 |
| LABORER: PIPELAYER | $32.12 | $14.73 | $46.85 |
Residential KS20260008 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $7.52 | $0.00 | $7.52 |
| TILE SETTER | $13.05 | $0.00 | $13.05 |
| SHEET METAL WORKER | $8.55 | $0.00 | $8.55 |
| ROOFER | $10.85 | $0.00 | $10.85 |
| POWER EQUIPMENT OPERATORS: LOADER | $14.95 | $3.87 | $18.82 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $12.89 | $3.25 | $16.14 |
| PLUMBER/PIPEFITTER | $11.89 | $1.06 | $12.95 |
| PAINTER | $8.55 | $0.00 | $8.55 |
| LABORER: MASON TENDER | $8.50 | $0.00 | $8.50 |
| LABORER | $7.52 | $0.00 | $7.52 |
| INSULATOR (BATT) | $11.85 | $0.00 | $11.85 |
| ELECTRICIAN | $10.62 | $0.00 | $10.62 |
| CEMENT MASON/CONCRETE FINISHER | $12.00 | $0.00 | $12.00 |
| CARPENTER (EXCLUDING BATT INSULATION) | $9.96 | $0.00 | $9.96 |
| BRICKLAYER | $14.00 | $0.00 | $14.00 |