Benewah County, Idaho: Davis-Bacon prevailing wages

Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.

Building ID20260008 rev 1

ClassificationRateFringeTotal
BOILERMAKER$47.67$28.38$76.05
BRICKLAYER$32.05$18.27$50.32
CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK AND SCAFFOLD BUILDING)$38.87$17.84$56.71
ELECTRICIAN$49.55$19.09$68.64
ELEVATOR MECHANIC A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS SERVICE AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY$67.61$38.44$106.05
IRONWORKER: REINFORCING AND STRUCTURAL$43.40$30.27$73.67
LABORER: COMMON OR GENERAL ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE$32.15$16.30$48.45
LABORER (MASON TENDER (CEMENT/CONCRETE, BRICK (HOD))$26.84$12.35$39.19
CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE$40.89$18.64$59.53
PLUMBER (ZONE 1)$44.57$26.58$71.15
ROOFER$35.75$15.21$50.96
SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION)$39.00$22.42$61.42

Heavy ID20260065 rev 1

ClassificationRateFringeTotal
CARPENTER (FORM WORK ONLY)$38.87$17.84$56.71
ELECTRICIAN$49.55$19.09$68.64
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 OVER SCALE (B): OVER 250': $.80 OVER SCALE$30.41$15.95$46.36
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE$29.31$15.95$45.26
POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE$29.04$15.95$44.99
POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE$28.76$15.95$44.71
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE$28.60$15.95$44.55
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00$28.44$15.95$44.39
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00$27.51$15.95$43.46
IRONWORKER: REINFORCING AND STRUCTURAL$43.40$30.27$73.67
LABORER (PIPELINE ONLY): COMMON$26.28$12.15$38.43
LABORER:GROUP 1A FLAGGER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE$25.84$13.00$38.84
LABORER: GROUP 4 ASPHALT INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE$28.48$13.00$41.48
CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE$40.89$18.64$59.53
PLUMBER (ZONE 1)$37.71$23.44$61.15
TRUCK DRIVER: WATER TRUCK$24.48$11.67$36.15
TRUCK DRIVER: LOWBOY TRUCK$21.00$12.10$33.10
OPERATOR: CONCRETE BATCH PLANT$24.94$11.96$36.90
OPERATOR: FORKLIFT$21.20$0.00$21.20
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$20.97$0.00$20.97
LABORER: PIPELAYER$17.67$7.26$24.93
LABORER: LANDSCAPE$22.13$11.13$33.26
LABORER: COMMON OR GENERAL$23.75$8.98$32.73
CARPENTER, EXCLUDES FORM WORK$29.92$5.20$35.12
TRUCK DRIVER: DUMP (OVER 6 YDS)$37.02$20.93$57.95
TRUCK DRIVER: DUMP (6 YDS AND UNDER)$36.58$20.93$57.51

Highway ID20260088 rev 1

ClassificationRateFringeTotal
LABORER: MASON TENDER (CEMENT/CONCRETE)$28.21$13.00$41.21
CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE$40.89$18.64$59.53
TRUCK DRIVER: WATER TRUCK$23.12$10.75$33.87
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK$22.54$12.35$34.89
TRUCK DRIVER: LOWBOY TRUCK$22.12$13.20$35.32
TRUCK DRIVER: DUMP TRUCK$23.40$10.75$34.15
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$22.66$10.90$33.56
TRAFFIC CONTROL: FLAGGER$21.46$10.12$31.58
OPERATOR: SCREED$25.71$11.55$37.26
OPERATOR: ROTOMILL$29.78$4.52$34.30
OPERATOR: ROLLER (SUBGRADE)$22.24$8.57$30.81
OPERATOR: ROLLER$25.49$11.55$37.04
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$25.66$11.03$36.69
OPERATOR: OILER$25.66$9.23$34.89
OPERATOR: MECHANIC$26.00$9.93$35.93
OPERATOR: LOADER$25.76$10.31$36.07
OPERATOR: HYDROSEEDER$24.76$11.51$36.27
OPERATOR: GRADER/BLADE$26.00$10.30$36.30
OPERATOR: CRUSHER$25.06$9.23$34.29
OPERATOR: CRANE$27.18$10.97$38.15
OPERATOR: BULLDOZER$25.73$11.51$37.24
OPERATOR: BROOM/SWEEPER$26.82$11.55$38.37
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$25.35$11.55$36.90
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$25.97$10.95$36.92
LABORER: GRADE CHECKER$23.41$10.78$34.19
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND)$23.98$11.05$35.03
LABORER: COMMON OR GENERAL$22.92$10.01$32.93
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$22.86$9.40$32.26
HIGHWAY/PARKING LOT STRIPING: PAINTER$23.80$6.67$30.47
ELECTRICIAN$26.83$11.94$38.77
CARPENTER (FORM WORK ONLY)$26.57$8.10$34.67

Residential ID20260003 rev 1

ClassificationRateFringeTotal
TRUCK DRIVER$10.33$0.00$10.33
SHEET METAL WORKER$10.00$1.10$11.10
ROOFER$10.00$0.00$10.00
POWER EQUIPMENT OPERATORS: PAVER; BLADE, SCREED AND ROLLER (ASPHALT)$8.00$0.00$8.00
POWER EQUIPMENT OPERATORS: FRONT END LOADER$8.75$0.00$8.75
POWER EQUIPMENT OPERATORS: (BACKHOE)$8.34$0.00$8.34
PLUMBER$8.50$0.00$8.50
PAINTER$8.00$0.00$8.00
LABORER$7.25$0.00$7.25
ELECTRICIAN$9.18$0.00$9.18
CARPENTER$8.30$0.00$8.30
BRICKLAYER$11.86$0.00$11.86

Get an email when rates change here

One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.