Stewart County, Georgia: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building GA20260106 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (STEWART, TAYLOR, & WEBSTER COUNTIES) | $38.65 | $12.75 | $51.40 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (DODGE, MACON, UPSON, & WILKINSON COUNTIES) | $32.00 | $14.71 | $46.71 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (CRISP, DOOLY, SUMTER, & WILCOX COUNTIES) | $29.50 | $14.88 | $44.38 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $52.08 | $38.44 | $90.52 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 250 TONS) (CRISP, DODGE, DOOLY, MACON, SCHLEY, STEWART, SUMTER, TAYLOR, WEBSTER, WILCOX, & WILKINSON COUNTIES) | $34.00 | $17.70 | $51.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 120 TONS) (CRISP, DODGE, DOOLY, MACON, SCHLEY, STEWART, SUMTER, TAYLOR, WEBSTER, WILCOX, & WILKINSON COUNTIES) | $33.00 | $17.70 | $50.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 10 TONS) (CRISP, DODGE, DOOLY, MACON, SCHLEY, STEWART, SUMTER, TAYLOR, WEBSTER, WILCOX, & WILKINSON COUNTIES) | $32.00 | $17.70 | $49.70 |
| OPERATOR: CRANE (UPSON COUNTY) | $38.53 | $16.08 | $54.61 |
| PAINTER: BRUSH, ROLLER, SPRAY | $26.00 | $14.90 | $40.90 |
| PLUMBER (SCHLEY, STEWART, & WEBSTER COUNTIES) | $30.00 | $16.66 | $46.66 |
| PIPEFITTER: INCLUDING HVAC PIPE AND HVAC UNIT INSTALLATION (SCHLEY, STEWART, & WEBSTER COUNTIES) | $30.00 | $16.66 | $46.66 |
| PLUMBER (CRISP, DODGE, DOOLY, MACON, SUMTER, TAYLOR, UPSON, WILCOX, & WILKINSON COUNTIES) | $38.98 | $17.01 | $55.99 |
| PIPEFITTER: INCLUDING HVAC PIPE AND HVAC UNIT INSTALLATION (CRISP, DODGE, DOOLY, MACON, SUMTER, TAYLOR, UPSON, WILCOX, & WILKINSON COUNTIES) | $38.98 | $17.01 | $55.99 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $17.95 | $55.70 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $18.81 | $1.44 | $20.25 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $18.91 | $0.00 | $18.91 |
| ROOFER | $13.62 | $0.00 | $13.62 |
| OPERATOR: OILER | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $15.50 | $0.65 | $16.15 |
| LABORER: PIPELAYER | $13.33 | $0.00 | $13.33 |
| LABORER: COMMON OR GENERAL | $10.51 | $0.59 | $11.10 |
| IRONWORKER, STRUCTURAL | $16.75 | $0.00 | $16.75 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 | $17.72 |
| GLAZIER | $14.93 | $1.11 | $16.04 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $12.00 | $0.00 | $12.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.45 | $0.54 | $12.99 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $18.00 | $0.00 | $18.00 |
Heavy GA20260061 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (SCHLEY, STEWART, TALBOT, TAYLOR, TROUP, & WEBSTER COUNTIES) | $38.65 | $12.75 | $51.40 |
| ELECTRICIAN (BALDWIN, BLECKLEY, DODGE, LAURENS, MACON, UPSON, & WILKINSON COUNTIES) | $32.00 | $14.71 | $46.71 |
| ELECTRICIAN (DOOLY, SUMTER, & WILCOX COUNTIES) | $29.50 | $14.88 | $44.38 |
| TRUCK DRIVER: DUMP TRUCK | $12.00 | $2.14 | $14.14 |
| OPERATOR: LOADER | $15.92 | $0.00 | $15.92 |
| OPERATOR: GRADER/BLADE | $18.88 | $1.32 | $20.20 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.86 | $1.76 | $20.62 |
| LABORER: PIPELAYER | $11.48 | $0.00 | $11.48 |
| LABORER: COMMON OR GENERAL | $10.69 | $0.00 | $10.69 |
| CEMENT MASON/CONCRETE FINISHER | $14.11 | $1.78 | $15.89 |
| CARPENTER (FORM WORK ONLY) | $15.21 | $0.00 | $15.21 |
Highway GA20260069 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $21.58 | $3.58 | $25.16 |
| TRAFFIC CONTROL: FLAGGER | $14.64 | $0.00 | $14.64 |
| OPERATOR: ROLLER | $18.51 | $3.99 | $22.50 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.22 | $4.10 | $27.32 |
| OPERATOR: LOADER | $22.81 | $1.91 | $24.72 |
| OPERATOR: GRADER/BLADE | $26.31 | $5.43 | $31.74 |
| OPERATOR: CRANE | $39.31 | $0.00 | $39.31 |
| OPERATOR: BULLDOZER | $22.82 | $0.00 | $22.82 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.40 | $3.73 | $27.13 |
| LABORER: PIPELAYER | $22.42 | $0.00 | $22.42 |
| LABORER: COMMON OR GENERAL | $16.41 | $0.00 | $16.41 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $16.72 | $2.23 | $18.95 |
| CEMENT MASON/CONCRETE FINISHER | $28.44 | $0.00 | $28.44 |
| CARPENTER | $32.68 | $0.00 | $32.68 |
Residential GA20260019 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER | $9.73 | $0.00 | $9.73 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $12.72 | $0.00 | $12.72 |
| PAINTER: BRUSH ONLY | $10.47 | $0.00 | $10.47 |
| OPERATOR: BACKHOE/EXCAVATOR | $11.89 | $0.00 | $11.89 |
| LABORER: COMMON OR GENERAL | $7.25 | $0.00 | $7.25 |
| HVAC MECHANIC (HVAC PIPE INSTALLATION) | $11.55 | $0.00 | $11.55 |
| ELECTRICIAN | $11.44 | $0.00 | $11.44 |
| DRYWALL HANGER | $8.78 | $0.00 | $8.78 |
| CEMENT MASON/CONCRETE FINISHER | $8.00 | $0.00 | $8.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING | $9.25 | $0.00 | $9.25 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.