Van Buren County, Arkansas: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building AR20260014 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (BRUSH AND ROLLER) | $17.78 | $0.00 | $17.78 |
| MILLWRIGHT | $34.02 | $11.88 | $45.90 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $28.94 | $14.95 | $43.89 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $33.25 | $15.00 | $48.25 |
| POWER EQUIPMENT OPERATOR: CRANE | $34.25 | $15.00 | $49.25 |
| IRONWORKER, STRUCTURAL | $28.00 | $21.21 | $49.21 |
| PAINTER (SPRAY) | $16.25 | $10.42 | $26.67 |
| TRUCK DRIVER: DUMP TRUCK | $15.00 | $0.00 | $15.00 |
| PLUMBER | $17.73 | $2.84 | $20.57 |
| OPERATOR: BULLDOZER | $18.14 | $0.00 | $18.14 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.08 | $0.00 | $23.08 |
| LABORER: MASON TENDER - BRICK | $10.00 | $0.00 | $10.00 |
| LABORER: COMMON OR GENERAL | $11.72 | $0.00 | $11.72 |
| HVAC MECHANIC: HVAC DUCT INSTALLATION | $17.27 | $5.03 | $22.30 |
| CEMENT MASON/CONCRETE FINISHER | $15.62 | $0.00 | $15.62 |
| CARPENTER, INCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $21.80 | $0.00 | $21.80 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
Heavy AR20260046 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $14.66 | $0.00 | $14.66 |
| OPERATOR: BULLDOZER | $17.11 | $0.00 | $17.11 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.22 | $0.94 | $18.16 |
| LABORER: PIPELAYER | $12.56 | $1.19 | $13.75 |
| LABORER: COMMON OR GENERAL | $12.50 | $1.18 | $13.68 |
| CARPENTER, INCLUDES FORM WORK | $17.32 | $3.15 | $20.47 |
Highway AR20260151 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI/TRAILER TRUCK | $10.75 | $0.00 | $10.75 |
| TRUCK DRIVER: WATER TRUCK | $16.09 | $0.00 | $16.09 |
| TRUCK DRIVER: LOWBOY TRUCK | $18.15 | $0.00 | $18.15 |
| TRUCK DRIVER: FLATBED TRUCK | $12.75 | $0.00 | $12.75 |
| TRUCK DRIVER: DUMP TRUCK | $13.40 | $0.00 | $13.40 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $13.76 | $0.00 | $13.76 |
| TRAFFIC CONTROL: FLAGGER | $10.50 | $0.00 | $10.50 |
| OPERATOR: TRANSFER MATERIAL MACHINE | $15.06 | $0.00 | $15.06 |
| OPERATOR: SCREED | $15.91 | $0.00 | $15.91 |
| OPERATOR: SCRAPER | $17.78 | $0.00 | $17.78 |
| OPERATOR: ROLLER | $14.00 | $0.00 | $14.00 |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | $19.30 | $0.00 | $19.30 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $17.90 | $0.00 | $17.90 |
| OPERATOR: OILER | $18.38 | $0.00 | $18.38 |
| OPERATOR: MILLING MACHINE | $18.75 | $0.00 | $18.75 |
| OPERATOR: MECHANIC | $19.10 | $0.00 | $19.10 |
| OPERATOR: LOADER | $14.86 | $0.00 | $14.86 |
| OPERATOR: GRADER/BLADE | $22.68 | $0.00 | $22.68 |
| OPERATOR: CRANE | $25.60 | $0.00 | $25.60 |
| OPERATOR: BULLDOZER | $15.98 | $0.00 | $15.98 |
| OPERATOR: BROOM/SWEEPER | $14.94 | $0.00 | $14.94 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.49 | $0.00 | $19.49 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.77 | $0.00 | $20.77 |
| OPERATOR: ASPHALT PLANT | $17.67 | $0.00 | $17.67 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | $0.00 | $11.51 |
| LABORER: LANDSCAPE | $11.53 | $0.00 | $11.53 |
| LABORER: COMMON OR GENERAL | $10.65 | $0.00 | $10.65 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $13.23 | $0.00 | $13.23 |
| IRONWORKER, STRUCTURAL | $19.58 | $0.00 | $19.58 |
| IRONWORKER, REINFORCING | $15.36 | $0.00 | $15.36 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | $13.49 | $0.00 | $13.49 |
| CEMENT MASON/CONCRETE FINISHER | $15.79 | $0.00 | $15.79 |
| CARPENTER, EXCLUDES FORM WORK | $15.78 | $0.00 | $15.78 |
| CARPENTER (FORM WORK ONLY) | $19.92 | $0.00 | $19.92 |
Residential AR20260108 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $8.95 | $0.00 | $8.95 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $10.54 | $0.00 | $10.54 |
| ROOFER | $11.00 | $0.00 | $11.00 |
| PLUMBER | $16.67 | $0.00 | $16.67 |
| PAINTER: BRUSH AND SPRAY | $9.33 | $0.00 | $9.33 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $10.50 | $0.00 | $10.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $8.23 | $0.00 | $8.23 |
| LABORER: MASON TENDER - BRICK | $8.39 | $0.00 | $8.39 |
| LABORER: COMMON OR GENERAL | $8.00 | $0.15 | $8.15 |
| INSTALLER - SIDING (METAL/ALUMINUM/VINYL) | $8.00 | $0.00 | $8.00 |
| INSTALLER - GUTTERS | $9.95 | $0.00 | $9.95 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT AND UNIT) | $12.41 | $0.00 | $12.41 |
| ELECTRICIAN | $13.35 | $0.00 | $13.35 |
| CEMENT MASON/CONCRETE FINISHER | $13.60 | $0.00 | $13.60 |
| CARPENTER | $11.96 | $0.00 | $11.96 |
| BRICKLAYER | $13.28 | $0.00 | $13.28 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.