Mobile County, Alabama: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Bidding a job in Mobile County? Pin your bid date to lock the revision that legally applies under the FAR ten-day rule, and get an email if anything moves before or after opening.
Building AL20260092 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.10 | $16.40 | $47.50 |
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| ELECTRICIAN | $30.90 | $10.34 | $41.24 |
| POWER EQUIPMENT OPERATOR: CRANE | $31.75 | $14.55 | $46.30 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $29.90 | $14.55 | $44.45 |
| PLUMBER | $35.20 | $13.51 | $48.71 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $27.22 | $13.98 | $41.20 |
| TRUCK DRIVER: DUMP TRUCK | $13.18 | $0.00 | $13.18 |
| TILE SETTER | $15.86 | $0.00 | $15.86 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $21.50 | $0.00 | $21.50 |
| ROOFER | $13.61 | $0.00 | $13.61 |
| PIPEFITTER | $20.78 | $5.04 | $25.82 |
| PAINTER: SPRAY | $14.31 | $0.00 | $14.31 |
| PAINTER (BRUSH AND ROLLER) | $15.41 | $0.00 | $15.41 |
| OPERATOR: ROLLER | $14.00 | $1.78 | $15.78 |
| OPERATOR: LOADER | $14.69 | $0.00 | $14.69 |
| OPERATOR: GRADER/BLADE | $17.52 | $0.89 | $18.41 |
| OPERATOR: FORKLIFT | $20.69 | $0.00 | $20.69 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.07 | $11.78 | $32.85 |
| LABORER: PIPELAYER | $12.58 | $0.00 | $12.58 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.16 | $0.00 | $12.16 |
| LABORER: MASON TENDER - BRICK | $11.00 | $0.00 | $11.00 |
| LABORER: COMMON OR GENERAL | $11.94 | $0.00 | $11.94 |
| IRONWORKER, STRUCTURAL | $19.73 | $1.15 | $20.88 |
| IRONWORKER, REINFORCING | $22.86 | $7.94 | $30.80 |
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 | $16.00 |
| CARPENTER, INCLUDES FORM WORK | $18.16 | $0.00 | $18.16 |
| BRICKLAYER | $19.81 | $0.00 | $19.81 |
Heavy AL20260110 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BULLDOZER (PIPELINE) | $48.89 | $18.00 | $66.89 |
| POWER EQUIPMENT OPERATOR: BACKHOE, EXCAVATOR, TRACKHOE (PIPELINE) | $48.89 | $18.00 | $66.89 |
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $12.56 | $2.12 | $14.68 |
| OPERATOR: LOADER, INCLUDES WATER SEWER LINES | $17.64 | $2.14 | $19.78 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES (EXCLUDES, PIPELINE) | $13.56 | $0.00 | $13.56 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $11.95 | $0.00 | $11.95 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $15.21 | $6.16 | $21.37 |
| ELECTRICIAN | $19.56 | $0.00 | $19.56 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | $13.78 | $0.00 | $13.78 |
| CARPENTER, INCLUDES FORM WORK | $19.05 | $7.86 | $26.91 |
Residential AL20260053 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $9.56 | $0.00 | $9.56 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $16.06 | $0.00 | $16.06 |
| ROOFER, INCLUDES BUILT UP, METAL, SHAKE & SHINGLE, AND SINGLE PLY ROOFS | $13.98 | $0.81 | $14.79 |
| PLUMBER | $13.56 | $0.00 | $13.56 |
| PAINTER, EXCLUDES DRYWALL FINISHING/TAPING | $9.37 | $0.00 | $9.37 |
| OPERATOR: LOADER (FRONT END) | $12.52 | $0.00 | $12.52 |
| OPERATOR: BULLDOZER | $12.60 | $0.00 | $12.60 |
| OPERATOR: BACKHOE | $11.20 | $0.00 | $11.20 |
| LABORER: PIPELAYER | $9.00 | $0.00 | $9.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $7.25 | $0.00 | $7.25 |
| LABORER: LANDSCAPE | $7.66 | $0.00 | $7.66 |
| LABORER: COMMON OR GENERAL | $8.35 | $0.00 | $8.35 |
| IRONWORKER, STRUCTURAL | $11.91 | $3.40 | $15.31 |
| IRONWORKER, ORNAMENTAL | $10.46 | $0.00 | $10.46 |
| ELECTRICIAN | $11.79 | $0.00 | $11.79 |
| DRYWALL FINISHER/TAPER | $12.00 | $0.00 | $12.00 |
| CEMENT MASON/CONCRETE FINISHER | $10.35 | $0.00 | $10.35 |
| CARPENTER, INCLUDES FORM WORK | $11.72 | $0.00 | $11.72 |
| BRICKLAYER | $12.69 | $0.00 | $12.69 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.