Macon County, Alabama: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building AL20260078 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| ELECTRICIAN | $32.15 | $17.43 | $49.58 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $29.90 | $14.55 | $44.45 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $29.90 | $14.55 | $44.45 |
| PLUMBER | $35.20 | $13.51 | $48.71 |
| TRUCK DRIVER: DUMP TRUCK | $14.05 | $0.00 | $14.05 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $20.00 | $10.94 | $30.94 |
| PAINTER (BRUSH AND ROLLER) | $15.83 | $0.00 | $15.83 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.48 | $11.78 | $32.26 |
| LABORER: COMMON OR GENERAL | $11.41 | $0.00 | $11.41 |
| CEMENT MASON/CONCRETE FINISHER | $16.50 | $1.12 | $17.62 |
| CARPENTER | $14.01 | $0.00 | $14.01 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
Heavy AL20260001 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| SELF-PROPELLED HOPPER DREDGE DRAG TENDERS THE FOLLOWING RATES WERE REVISED PURSUANT TO 29 CFR 1.6(C)(1) ON 02/07/2025 | $20.36 | $7.24 | $27.60 |
Highway AL20260136 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $12.95 | $0.00 | $12.95 |
| TRUCK DRIVER: LOWBOY TRUCK | $15.88 | $0.00 | $15.88 |
| TRUCK DRIVER: FLATBED TRUCK | $15.72 | $0.00 | $15.72 |
| TRUCK DRIVER: DUMP TRUCK | $14.21 | $0.00 | $14.21 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $13.14 | $0.00 | $13.14 |
| TRAFFIC CONTROL: FLAGGER | $14.35 | $0.00 | $14.35 |
| OPERATOR: ROLLER | $13.66 | $0.00 | $13.66 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $17.01 | $0.00 | $17.01 |
| OPERATOR: MILLING MACHINE | $15.54 | $0.00 | $15.54 |
| OPERATOR: MECHANIC | $17.97 | $0.00 | $17.97 |
| OPERATOR: LOADER | $14.12 | $0.00 | $14.12 |
| OPERATOR: GRADER/BLADE | $17.22 | $0.00 | $17.22 |
| OPERATOR: DISTRIBUTOR | $15.10 | $0.00 | $15.10 |
| OPERATOR: CRANE | $22.37 | $0.00 | $22.37 |
| OPERATOR: BULLDOZER | $16.59 | $0.00 | $16.59 |
| OPERATOR: BROOM/SWEEPER | $11.37 | $0.00 | $11.37 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $15.64 | $0.00 | $15.64 |
| OPERATOR: ASPHALT SPREADER | $15.65 | $0.00 | $15.65 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.44 | $0.00 | $15.44 |
| LABORER: COMMON OR GENERAL | $10.80 | $0.00 | $10.80 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $14.11 | $0.00 | $14.11 |
| LABORER GRADE CHECKER | $15.89 | $0.00 | $15.89 |
| IRONWORKER, REINFORCING | $16.28 | $0.00 | $16.28 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | $19.48 | $0.00 | $19.48 |
| ELECTRICIAN | $20.41 | $7.49 | $27.90 |
| CEMENT MASON/CONCRETE FINISHER | $13.71 | $0.00 | $13.71 |
| CARPENTER (FORM WORK ONLY) | $15.34 | $0.00 | $15.34 |
Residential AL20260023 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $10.02 | $0.00 | $10.02 |
| TILE SETTER | $16.00 | $0.00 | $16.00 |
| SHEET METAL WORKER | $10.47 | $0.00 | $10.47 |
| ROOFER, INCLUDES SHAKE & SHINGLE, AND SINGLE PLY ROOFS | $8.00 | $0.00 | $8.00 |
| PLUMBER | $10.25 | $0.00 | $10.25 |
| PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING | $10.21 | $0.00 | $10.21 |
| OPERATOR: BULLDOZER | $11.71 | $0.00 | $11.71 |
| OPERATOR: BACKHOE | $9.80 | $0.00 | $9.80 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $8.00 | $0.00 | $8.00 |
| LABORER: LANDSCAPE | $7.25 | $0.00 | $7.25 |
| LABORER: COMMON OR GENERAL | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN, INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $10.54 | $0.00 | $10.54 |
| DRYWALL HANGER | $11.18 | $0.00 | $11.18 |
| DRYWALL FINISHER/TAPER | $10.00 | $0.00 | $10.00 |
| CEMENT MASON/CONCRETE FINISHER | $9.96 | $0.00 | $9.96 |
| CARPENTER, EXCLUDES DRYWALL HANGING | $10.38 | $0.00 | $10.38 |
| BRICKLAYER | $12.94 | $0.00 | $12.94 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.